Back to bathroom remodel contractors
R.L.Jones Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Aug 2026
- Last 24 months
- 3 permits filed
78 permits since 2000: 32 completed, 4 in progress, 26 never finaled, 16 expired or cancelled.
Of the 26 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 18 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
11 bathroom remodel permits: 4 completed, 1 in progress, 2 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2026 | In progress issued Aug 2026 | 409 Cornwall St | unit 409: one kitchen and one bathroom remodel. replace kitchen sink, cabinets, bathroom sink, vanity, toilet, several lights in kitchen and bathroom. new bathroom tiles. like for like remodels no wall moving.Details
unit 409: one kitchen and one bathroom remodel. replace kitchen sink, cabinets, bathroom sink, vanity, toilet, several lights in kitchen and bathroom. new bathroom tiles. like for like remodels no wall moving. | $10,000 |
| May 30, 2017 | Never finaled filed May 2017, never issued | 212 Andover St | add a 3rd story to include a master bedroom, multi purpose rm, office, bathrm and patio. convert open garage area at g/f to bedrm, rec. rm & bath. remodel kitchen at 2/f and add(n) staris from g/f to(n) 3rd floorDetails
add a 3rd story to include a master bedroom, multi purpose rm, office, bathrm and patio. convert open garage area at g/f to bedrm, rec. rm & bath. remodel kitchen at 2/f and add(n) staris from g/f to(n) 3rd floor | $250,000 |
| Sep 26, 2016 | Completed final sign-off Jan 2021 | 515 Goettingen St | add (2) new bedrooms and a bathroom at the rear of the (e) garage, to include leveling a portion of the main level and repairs to the foundation. also installation of a new rear deck and stairs from main level to yardDetails
add (2) new bedrooms and a bathroom at the rear of the (e) garage, to include leveling a portion of the main level and repairs to the foundation. also installation of a new rear deck and stairs from main level to yard | $110,000 |
| Jul 19, 2016 | Completed final sign-off Jan 2018 | 76 Vesta St | remove un-permitted bathroom inlcuding walls, doors, raised floor, plumbing and electrical wiring. restore garage area to code compliance.Details
remove un-permitted bathroom inlcuding walls, doors, raised floor, plumbing and electrical wiring. restore garage area to code compliance. | $12,000 |
| Nov 13, 2015 | Completed final sign-off May 2016 | 1945 Washington St | unit 604: retile bathtub/shower walls & bathroom floor, repair possible water damage.Details
unit 604: retile bathtub/shower walls & bathroom floor, repair possible water damage. | $8,000 |
| Feb 27, 2015 | Never finaled issued Feb 2015, no final | 2228 Clay St | renovations to existing master bathroom to include adding a divider wall, new stall shower, toilet and (2) sinks, creating powder room with new toilet and sink. relocate laundry to hall closet location; maher n/a.Details
renovations to existing master bathroom to include adding a divider wall, new stall shower, toilet and (2) sinks, creating powder room with new toilet and sink. relocate laundry to hall closet location; maher n/a. | $25,000 |
| Oct 7, 2010 | Expired or cancelled expired Jun 2014 | 571 32nd Av | repl kitchen cabinets and counters, repl shower in bathroom @ 2nd flr, non structural work lighting to comply with cec 150(k)Details
repl kitchen cabinets and counters, repl shower in bathroom @ 2nd flr, non structural work lighting to comply with cec 150(k) | $25,000 |
| Jul 27, 2009 | Completed final sign-off Aug 2009 | 1340 Utah St | rev. to pa# 2008.03.19.7465. show installation of appliances and no cabinets in kitchen for final per bldg inspector's request. show installation of new electric heating fixtures in living rm, bedroom, office and bathroomDetails
rev. to pa# 2008.03.19.7465. show installation of appliances and no cabinets in kitchen for final per bldg inspector's request. show installation of new electric heating fixtures in living rm, bedroom, office and bathroom | |
| May 19, 2006 | Expired or cancelled expired Nov 2007 | 1800 Palou Av | install 1 new bathroom in existing basement of building with artificial lighting and mechanical ventilationDetails
install 1 new bathroom in existing basement of building with artificial lighting and mechanical ventilation | $15,000 |
| Apr 28, 2006 | Expired or cancelled expired Nov 2007 | 1643 15th St | reconfigure 1st floor plan, install 2 new windows fronting alley, install new door at rear. kitchen and bath remodelDetails
reconfigure 1st floor plan, install 2 new windows fronting alley, install new door at rear. kitchen and bath remodel | $50,000 |
| Jun 16, 2005 | Expired or cancelled expired Mar 2007 | 226 Bemis St | renovate 2 bathrooms as is to include put tiles on wall,new tile on floor,Details
renovate 2 bathrooms as is to include put tiles on wall,new tile on floor, | $14,000 |