Back to kitchen remodel contractors
R K Woods Inc. **See Note*
- Based in
- San Francisco
- On San Francisco permits
- Dec 2005 to Sep 2011
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 202 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2011 | Completed final sign-off Jun 2013 | 5698 03rd St | interior ti for new restaurant - wing stop - kitchen, class 1 hood, janitor closet, seating area. signage under seperate permit.Details
interior ti for new restaurant - wing stop - kitchen, class 1 hood, janitor closet, seating area. signage under seperate permit. | $110,000 |
| Jul 16, 2010 | Completed final sign-off Jul 2011 | 1233 Divisadero St | #b- remove and replace kitchen cabinets and bathroom vanity. remove and reset kitchen sink. three new gfic plugs. new tub and toilet. no structural changes. new carpet and wood flooring. work on 2nd floorDetails
#b- remove and replace kitchen cabinets and bathroom vanity. remove and reset kitchen sink. three new gfic plugs. new tub and toilet. no structural changes. new carpet and wood flooring. work on 2nd floor | $23,000 |
| Oct 7, 2008 | Completed final sign-off Oct 2008 | 621 Lincoln Wy | #2- int. remodel only.replace cabinets & fixt @ kitchen & bath, replace electrical lines & fixt to meet current code. replace (e)galvanized plumbing pipes with copper pipes, remove lath & plaster and replace it with 5/8 gyp board. replace windows in kind not visible from st.w/insulated glassDetails
#2- int. remodel only.replace cabinets & fixt @ kitchen & bath, replace electrical lines & fixt to meet current code. replace (e)galvanized plumbing pipes with copper pipes, remove lath & plaster and replace it with 5/8 gyp board. replace windows in kind not visible from st.w/insulated glass | $20,000 |
| Jun 30, 2008 | Completed final sign-off Oct 2008 | 621 Lincoln Wy | revision to pa# 2008-0530-3205 & 2008-0612-4227, to remove the door between lr & bedroom @unit #3 & #4, revise pa# 2008-0612-4227 to show a new wall @stairway (drafting error). replace new windows facing lightwell @kitchen and bathroom in unit #3 & #4.Details
revision to pa# 2008-0530-3205 & 2008-0612-4227, to remove the door between lr & bedroom @unit #3 & #4, revise pa# 2008-0612-4227 to show a new wall @stairway (drafting error). replace new windows facing lightwell @kitchen and bathroom in unit #3 & #4. | $4,000 |
| Jun 12, 2008 | Completed final sign-off Oct 2008 | 621 Lincoln Wy | interior remodel at unit 3 & 4. unit 4 - replace all cabinets & fixtures at kitchen & bathrm, replace all electrical lines & plumbing fixtures, remove lath & plaster & replace w/ 5/8" gym board & install insulation. at unit 3 - move/replace entry door.Details
interior remodel at unit 3 & 4. unit 4 - replace all cabinets & fixtures at kitchen & bathrm, replace all electrical lines & plumbing fixtures, remove lath & plaster & replace w/ 5/8" gym board & install insulation. at unit 3 - move/replace entry door. | $35,000 |
| Dec 19, 2005 | Completed final sign-off Jul 2009 | 1274 08th Av | 3 stories addition and 3rd floor roof deck at rear. 3 stories partial lightwell infill. remodel kitchen and bathrooms and add closets - horizontal addition.Details
3 stories addition and 3rd floor roof deck at rear. 3 stories partial lightwell infill. remodel kitchen and bathrooms and add closets - horizontal addition. | $80,000 |