R Group, Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Dec 2025
- Last 24 months
- 8 permits filed
72 permits since 2000: 59 completed, 3 in progress, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 6 completed, 2 expired or cancelled. Typically 5 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 6, 2025 | Completed final sign-off Dec 2025 | 1658 Kirkwood Av | convert portion of existing unit to storage at ground floor. remove (e) unit stair from ground floor to second floor. work tacitly required by cpc as part of the in-review adu application.Details
convert portion of existing unit to storage at ground floor. remove (e) unit stair from ground floor to second floor. work tacitly required by cpc as part of the in-review adu application. | $8,000 |
| Nov 6, 2025 | Completed final sign-off Dec 2025 | 1654 Kirkwood Av | convert portion of existing unit to storage at ground floor. remove (e) unit stair from ground floor to second floor. work tacitly required by cpc as part of the in-review adu application.Details
convert portion of existing unit to storage at ground floor. remove (e) unit stair from ground floor to second floor. work tacitly required by cpc as part of the in-review adu application. | $8,000 |
| Mar 31, 2023 | Completed final sign-off Nov 2023 | 1278 Minnesota St | partition (e) pdr space into two sep pdr spaces. basement is on minnesota st level. ground fl is one flr above minnesota. proposed change is entirely within the (e) envelope. scope of work localized. new internal stairs from ground to basement at north industrial area.Details
partition (e) pdr space into two sep pdr spaces. basement is on minnesota st level. ground fl is one flr above minnesota. proposed change is entirely within the (e) envelope. scope of work localized. new internal stairs from ground to basement at north industrial area. | $5,000 |
| Aug 5, 2011 | Expired or cancelled expired May 2014 | 2419 Mission St | to replace rear stairs as needed. less than 50% stairs being replaced. to comply with his nov #200875513 dated 10/14/2008.Details
to replace rear stairs as needed. less than 50% stairs being replaced. to comply with his nov #200875513 dated 10/14/2008. | $3,000 |
| Feb 7, 2011 | Completed final sign-off May 2011 | 1310 Minnesota St | remove north facing property line windows at all floors per plan. in-fill frame with 2x6 studs with wood walls & shotcrete at concrete wall. stucco to match (e) stucco exterior. work @ common area only, 1/f-garage level & stairs. remove window total 9 windows. not required for light & vent.Details
remove north facing property line windows at all floors per plan. in-fill frame with 2x6 studs with wood walls & shotcrete at concrete wall. stucco to match (e) stucco exterior. work @ common area only, 1/f-garage level & stairs. remove window total 9 windows. not required for light & vent. | $500 |
| Jul 23, 2010 | Completed final sign-off Apr 2023 | 25 Rutledge St | remodel interior space. add new inter connecting stairs between floors. add new full baths and bedroom at ground level, add new flat skylights at upper floorDetails
remodel interior space. add new inter connecting stairs between floors. add new full baths and bedroom at ground level, add new flat skylights at upper floor | $45,000 |
| Jun 23, 2009 | Completed final sign-off Mar 2010 | 286 Holladay Av | interior remodel & lateral stiffening (voluntary). bathroom & kitchen remodel @ 2nd & 3rd floors. new bathroom & bedroom @ ground floor. new staircase. new bathroom @ 3rd floor. new powder room @ 2nd floor.Details
interior remodel & lateral stiffening (voluntary). bathroom & kitchen remodel @ 2nd & 3rd floors. new bathroom & bedroom @ ground floor. new staircase. new bathroom @ 3rd floor. new powder room @ 2nd floor. | $138,000 |
| Jul 2, 2008 | Expired or cancelled cancelled Jan 2020 | 21 Fountain St | removal of interior partition walls & replace with relocated partition walls, reconfiguration/relocate of interior stairway, new foundation throughoutDetails
removal of interior partition walls & replace with relocated partition walls, reconfiguration/relocate of interior stairway, new foundation throughout | $200,000 |