Permit GraphShortlistSan Francisco building permits since 2000

R G K Construction Services

Contractor license
801983
State license record
Based in
Berkeley
On San Francisco permits
Jul 2002 to Sep 2008
Last 24 months
0 permits filed

13 permits since 2000: 10 completed, 2 never finaled, 1 expired or cancelled.

Of the 2 never-finaled permits, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllDeck 2Stairs 3Kitchen remodel 2

3 stairs permits: 3 completed. Typically 0 days from filing to permit and 81 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 25, 2008Completed
final sign-off Nov 2008
4215 Cesar Chavez Stcomply with nov# 200861133. deck repair. less than 50%. remove & replace all dry rotted wood @ 2nd floor stair structure, remove & replace (e) fascia @ front of deck @ 2nd floor stairs, provide 4" max spacing @ guardrails & hard rails as required.
Details
Permit
200808250022
Status
complete
Filed
Aug 25, 2008
Permit issued
Aug 25, 2008
Final sign-off
Nov 14, 2008
Declared cost
$2,500
Address
4215 Cesar Chavez St

comply with nov# 200861133. deck repair. less than 50%. remove & replace all dry rotted wood @ 2nd floor stair structure, remove & replace (e) fascia @ front of deck @ 2nd floor stairs, provide 4" max spacing @ guardrails & hard rails as required.

Open the permit page

$2,500
Jan 10, 2007Completed
final sign-off May 2009
675 Teresita Blremodel of (e) residence to include (n) master suite (nte 500 sq ft). replace (e) siding, add all windows and exit doors. new decks and balconies, interior stair to be replaced. no vertical.
Details
Permit
200701101384
Status
complete
Filed
Jan 10, 2007
Permit issued
Sep 4, 2007
Final sign-off
May 28, 2009
Declared cost
$100,000
Address
675 Teresita Bl

remodel of (e) residence to include (n) master suite (nte 500 sq ft). replace (e) siding, add all windows and exit doors. new decks and balconies, interior stair to be replaced. no vertical.

Open the permit page

$100,000
Apr 20, 2004Completed
final sign-off Jun 2004
263 Mallorca Wybuild new stairs to basement room by removing closet and going down @ 2nd flr bedroom, provide 2 lig
Details
Permit
200404201712
Status
complete
Filed
Apr 20, 2004
Permit issued
Apr 20, 2004
Final sign-off
Jun 25, 2004
Declared cost
$16,000
Address
263 Mallorca Wy

build new stairs to basement room by removing closet and going down @ 2nd flr bedroom, provide 2 lig

Open the permit page

$16,000