Back to kitchen remodel contractors
R C Wilson Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Jun 2011
- Last 24 months
- 0 permits filed
69 permits since 2000: 48 completed, 4 never finaled, 17 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 6 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 189 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2011 | Expired or cancelled expired Jul 2013 | 1327 Bay St | revision to appl #201011235567 - reframe (e) entry wall & isntall (n) door, instll (n) lighting @ living, dining, kitchen & bath, retrofit (e) window in kitchen & tankless water heater on roof.Details
revision to appl #201011235567 - reframe (e) entry wall & isntall (n) door, instll (n) lighting @ living, dining, kitchen & bath, retrofit (e) window in kitchen & tankless water heater on roof. | $500 |
| Feb 18, 2011 | Expired or cancelled expired Jul 2013 | 1327 Bay St | as built plans revision to app#201011235567.framing c e kitchen and extg bedroom for roof with lvl instead of 2x8 and installation of peralane. north wall. above windows per nov 201193407 and replace spiral stairscase.Details
as built plans revision to app#201011235567.framing c e kitchen and extg bedroom for roof with lvl instead of 2x8 and installation of peralane. north wall. above windows per nov 201193407 and replace spiral stairscase. | $4,000 |
| Sep 4, 2009 | Completed final sign-off Feb 2011 | 260 Valdez Av | gr fl remodel: relocate laundry area and mechanical area, add 2 full bathrooms, 2 bedrooms on ground level. remodel kitchen & stair. 1 bedroom exist on ground level. new windows on back and sides.Details
gr fl remodel: relocate laundry area and mechanical area, add 2 full bathrooms, 2 bedrooms on ground level. remodel kitchen & stair. 1 bedroom exist on ground level. new windows on back and sides. | $180,000 |
| May 12, 2009 | Completed final sign-off Oct 2009 | 2875 Jackson St | unit 4 - bathroom retile, swap out vanity toilet & tub. redo flooring in kitchen and replace cabinets and replace kitchen sink. provide high efficency lighting per t-24 if applicable.Details
unit 4 - bathroom retile, swap out vanity toilet & tub. redo flooring in kitchen and replace cabinets and replace kitchen sink. provide high efficency lighting per t-24 if applicable. | $15,000 |
| May 19, 2008 | Completed final sign-off Dec 2008 | 2698 San Jose Av | revision to existing permit #200804028628. rebuild kitchen in existing location & minor layout changes to lower level.Details
revision to existing permit #200804028628. rebuild kitchen in existing location & minor layout changes to lower level. | |
| Apr 2, 2008 | Completed final sign-off Dec 2008 | 2698 San Jose Av | kitchen, bathroom remodel. add /alter closet space in bedrooms. replace windows, remove molded drywall and add insulation along exterior bedroom walls. remodel lower/ garage floor for (n) fullbathroom, (n) family room and (n) bedroom. no sink nor counter in (n) family room at lower/ground floor.Details
kitchen, bathroom remodel. add /alter closet space in bedrooms. replace windows, remove molded drywall and add insulation along exterior bedroom walls. remodel lower/ garage floor for (n) fullbathroom, (n) family room and (n) bedroom. no sink nor counter in (n) family room at lower/ground floor. | $40,000 |
| Dec 13, 2006 | Completed final sign-off Mar 2007 | 130 Danvers St | remodel kitchen, new cabinets, applicanes, lighting, sink, counter and replace 1 window. also includes removing falsewall @ sw corner of room and moving door opening approximately 0.5' to the north.Details
remodel kitchen, new cabinets, applicanes, lighting, sink, counter and replace 1 window. also includes removing falsewall @ sw corner of room and moving door opening approximately 0.5' to the north. | $40,000 |
| Nov 10, 2006 | Completed final sign-off May 2007 | 240 Liberty St | kitchen & bath remodel.Details
kitchen & bath remodel. | $55,000 |