Pyramid Builders
- Based in
- San Francisco
- On San Francisco permits
- Jul 2002 to Jul 2007
- Last 24 months
- 0 permits filed
11 permits since 2000: 9 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 237 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2007 | Completed final sign-off Mar 2008 | 92 Maynard St | relocate rear stair(revision to pa#200705171595) remove 2 kitchen windows, replace with 1 door, & 1 window. remove 1 dorrr & window at bedroomk repalce with 1 window. replace bathroom window same aize & location. remove 1 door & window from 1st flr storage room; replace/1 window. replace garage**Details
relocate rear stair(revision to pa#200705171595) remove 2 kitchen windows, replace with 1 door, & 1 window. remove 1 dorrr & window at bedroomk repalce with 1 window. replace bathroom window same aize & location. remove 1 door & window from 1st flr storage room; replace/1 window. replace garage** | $3,000 |