Back to kitchen remodel contractors
Purev General Contracting
- Based in
- Clayton
- On San Francisco permits
- Jan 2017 to Apr 2018
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 22, 2017 | Completed final sign-off Dec 2018 | 50 Hiliritas Av | replace 1 exterior wood coor w/1 wood sliding glass door, add 3 skylights, kitchen remodel, 3 bathroom remodel, remove a 1/2 bath. lighting upgrade, 2 new water heaters. garage interior wall partial removal.Details
replace 1 exterior wood coor w/1 wood sliding glass door, add 3 skylights, kitchen remodel, 3 bathroom remodel, remove a 1/2 bath. lighting upgrade, 2 new water heaters. garage interior wall partial removal. | $90,000 |
| Oct 6, 2017 | Completed final sign-off Dec 2017 | 1540 Steiner St | replace kitchen cabinetry and appliances. installing 19 recessed lights and 3 outlets. maintain 1 hr separation at recessed lights and fans. per cec sec 714.4.2Details
replace kitchen cabinetry and appliances. installing 19 recessed lights and 3 outlets. maintain 1 hr separation at recessed lights and fans. per cec sec 714.4.2 | $14,500 |
| Jan 13, 2017 | Completed final sign-off Jun 2017 | 972 Plymouth Av | remodel kitchen, two bathrooms, replace flooring within same area. repair leaking of roof, patching, within the same bathroom. no structural work. kitchen lighting per cec 150(k)Details
remodel kitchen, two bathrooms, replace flooring within same area. repair leaking of roof, patching, within the same bathroom. no structural work. kitchen lighting per cec 150(k) | $30,000 |