Puckett Construction
- Based in
- Antioch
- On San Francisco permits
- Jul 2022 to Oct 2024
- Last 24 months
- 1 permit filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 0 days from filing to permit and 78 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2024 | Completed final sign-off Dec 2024 | 3025 23rd St | remove and replace dryrotted siding and framing members. replace decking and stairs existing 2 and one half level wood stair structure. revision to pa #22409201275Details
remove and replace dryrotted siding and framing members. replace decking and stairs existing 2 and one half level wood stair structure. revision to pa #22409201275 | $30,000 |
| Sep 20, 2024 | Completed final sign-off Dec 2024 | 3025 23rd St | to comply with 202301486, #3: remove/replace dry rotted t1 11 siding. r/r 4 vinly windows with same type & size (rear). make necessary repairs to exterior rear staircase as needed less than 50%.Details
to comply with 202301486, #3: remove/replace dry rotted t1 11 siding. r/r 4 vinly windows with same type & size (rear). make necessary repairs to exterior rear staircase as needed less than 50%. | $30,000 |