Ps2 Inc
- Based in
- Gardena
- On San Francisco permits
- Dec 2013 to Jun 2026
- Last 24 months
- 6 permits filed
623 permits since 2000: 524 completed, 4 in progress, 87 never finaled, 8 expired or cancelled.
Of the 87 never-finaled permits, 2 are 3 to 5 years old, 36 are 5 to 10 years old, 49 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 18 days from filing to permit and 414 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 3, 2017 | Completed final sign-off Nov 2018 | 677 Ellis St | revision to permit 2017-04-25-4823 to comply wiht novs, 201784231, 201784281, 201696561 and 201630491: repair existing main stair and restore connection to basement level, restore basement unit to original legal configuration, mep deferred to separate permits.Details
revision to permit 2017-04-25-4823 to comply wiht novs, 201784231, 201784281, 201696561 and 201630491: repair existing main stair and restore connection to basement level, restore basement unit to original legal configuration, mep deferred to separate permits. | $30,000 |
| Apr 25, 2017 | Completed final sign-off May 2018 | 677 Ellis St | to comply with nov #201630491 & nov #201696561 - repair the existing main stair & restore connection to basement level. this project involves repair of less than 25% of existing stairway. n/a maher ordinanceDetails
to comply with nov #201630491 & nov #201696561 - repair the existing main stair & restore connection to basement level. this project involves repair of less than 25% of existing stairway. n/a maher ordinance | $10,000 |
| Jul 11, 2016 | Never finaled issued Jul 2016, no final | 401 Church St | remodel of boys toilet room 109: fixtures replacement, floor and walls refinishing, lt fixtures replacement, accessible handrail at existing access stair to boys toilet and contrasting stripe at stair nosings.Details
remodel of boys toilet room 109: fixtures replacement, floor and walls refinishing, lt fixtures replacement, accessible handrail at existing access stair to boys toilet and contrasting stripe at stair nosings. | $12,000 |