Back to kitchen remodel contractors
Prosper Construction Dev Inc.
- Based in
- Sunnyvale
- On San Francisco permits
- Dec 2012 to Aug 2026
- Last 24 months
- 45 permits filed
238 permits since 2000: 142 completed, 30 in progress, 50 never finaled, 16 expired or cancelled.
Of the 50 never-finaled permits, 20 are 3 to 5 years old, 29 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
69 kitchen remodel permits: 45 completed, 5 in progress, 14 never finaled, 5 expired or cancelled. Typically 1 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Jul 2026 | 1930 33rd Av | add conditioned space on 1st flr (700 sqft) & a (n) bathroom. infill lightwell (50sqft) on 2nd flr. add a (n) interior stairway. relocate kitchen on 1st flr.Details
add conditioned space on 1st flr (700 sqft) & a (n) bathroom. infill lightwell (50sqft) on 2nd flr. add a (n) interior stairway. relocate kitchen on 1st flr. | $175,000 |
| May 28, 2026 | In progress issued May 2026 | 25 Vernon St | remodel full kitchen like for like. rewire entire home, 200a in-iind.Details
remodel full kitchen like for like. rewire entire home, 200a in-iind. | $16,500 |
| Mar 16, 2026 | In progress issued May 2026 | 999 Green St | unit 1104: remodel, demo/replace bath, move non-load bearing partition @ mater closet, add new washer/dryer, replace interior doors in-kind, remodel kitchen. window wall replacement of ne facade. no new square footage, no expansion.Details
unit 1104: remodel, demo/replace bath, move non-load bearing partition @ mater closet, add new washer/dryer, replace interior doors in-kind, remodel kitchen. window wall replacement of ne facade. no new square footage, no expansion. | $47,500 |
| Oct 17, 2025 | In progress issued Oct 2025 | 1930 Eddy St | apt 101: remove shelves in living room, install 4 wall cabinets and patch dry wall in the kitchen area, install crown molding in the living room, install laminated floor throughout apartment (not in bathroom) paint the area.Details
apt 101: remove shelves in living room, install 4 wall cabinets and patch dry wall in the kitchen area, install crown molding in the living room, install laminated floor throughout apartment (not in bathroom) paint the area. | $30,000 |
| Aug 5, 2025 | Completed final sign-off Nov 2025 | 149 Capistrano Av | refrence 202507100573, renovate e kitchen, add new bath (257 sf)Details
refrence 202507100573, renovate e kitchen, add new bath (257 sf) | $75,000 |
| Mar 26, 2024 | Completed final sign-off Oct 2024 | 3219 Laguna St | replace 1 sink and 1 lavatory. replace tile in bathrooms. replace kitchenette cabinets, countertop and flooring 1200 sq ft replacement in-kind. install 1 outlet in the kitchenette. accessibility upgrades.Details
replace 1 sink and 1 lavatory. replace tile in bathrooms. replace kitchenette cabinets, countertop and flooring 1200 sq ft replacement in-kind. install 1 outlet in the kitchenette. accessibility upgrades. | $10,000 |
| Dec 14, 2023 | In progress issued Jan 2024 | 841 Florida St | 2/f: remodel (e) kitchen & bathroom, construct (n) bathroom, widen internal stairscase to be code compliant. 1/f: (n) bedroom, meida room, bathroom, relocate laundry, new bar sink. add 3 skylights on flat roofDetails
2/f: remodel (e) kitchen & bathroom, construct (n) bathroom, widen internal stairscase to be code compliant. 1/f: (n) bedroom, meida room, bathroom, relocate laundry, new bar sink. add 3 skylights on flat roof | $180,000 |
| Oct 23, 2023 | Completed final sign-off Mar 2024 | 2155 Buchanan St | 1 kitchen remodel like for likeDetails
1 kitchen remodel like for like | $20,000 |
| Sep 12, 2023 | Completed final sign-off Feb 2024 | 896 34th Av | (1) kitchen remodel like for like - new subpanel 100 amp.Details
(1) kitchen remodel like for like - new subpanel 100 amp. | $30,000 |
| Aug 31, 2023 | Completed final sign-off Nov 2023 | 1458 Sutter St | complete kitchen remodel like fo like, no walls or layout change.Details
complete kitchen remodel like fo like, no walls or layout change. | $15,000 |
| Aug 23, 2023 | Completed final sign-off Jan 2024 | 1495 31st Av | revision to pa# 202209142446. remodel existing kitchen, remove island and relocate stove.Details
revision to pa# 202209142446. remodel existing kitchen, remove island and relocate stove. | |
| Aug 18, 2023 | Completed final sign-off Mar 2025 | 1578 47th Av | interior remodel of (e) living space. relocate kitchen (from 2/f to g/f), living room, and dining room. remodel bedrooms and bathrooms.Details
interior remodel of (e) living space. relocate kitchen (from 2/f to g/f), living room, and dining room. remodel bedrooms and bathrooms. | $150,000 |
| Aug 14, 2023 | Completed final sign-off Aug 2026 | 162 27th Av | revision to 201811095518. reduction in scope of work in which no 3rd fl addition in front of the house. retain infill entry stair but no lightwell change. retain 1st fl approved plans. retain 2nd fl kitchen but 2nd fl (e) bath change to two. retain 3rd fl master rd, master bath &Details
revision to 201811095518. reduction in scope of work in which no 3rd fl addition in front of the house. retain infill entry stair but no lightwell change. retain 1st fl approved plans. retain 2nd fl kitchen but 2nd fl (e) bath change to two. retain 3rd fl master rd, master bath & | |
| Jul 17, 2023 | Never finaled issued Jul 2023, no final | 3012 Market St | one kitchen remodel like for like no walls or layout change.Details
one kitchen remodel like for like no walls or layout change. | $25,000 |
| Jul 17, 2023 | Completed final sign-off Nov 2023 | 1760 Ofarrell St | unit #20: 2nd bathroom remodel and one kitchen remodel like for like, no walls or layout change. all work is non structural only.Details
unit #20: 2nd bathroom remodel and one kitchen remodel like for like, no walls or layout change. all work is non structural only. | $35,000 |
| Jun 8, 2023 | Completed final sign-off Jul 2023 | 887 28th Av | partial kitchen remodel: kitchen and countertop replacement, recirculating hood and induction cooktop.Details
partial kitchen remodel: kitchen and countertop replacement, recirculating hood and induction cooktop. | $5,000 |
| May 2, 2023 | Completed final sign-off Nov 2023 | 342 26th Av | replace (e) interior stairs. fill in (e) courtyard at 2/f. remodel (e) bathroom and kitchen.Details
replace (e) interior stairs. fill in (e) courtyard at 2/f. remodel (e) bathroom and kitchen. | $125,000 |
| Mar 7, 2023 | Completed final sign-off Jun 2024 | 149 Elsie St | kitchen remodel-remove interior partition wall, install n cabinets, countertops, applicanes, fixtures & finishes. no exterior work.Details
kitchen remodel-remove interior partition wall, install n cabinets, countertops, applicanes, fixtures & finishes. no exterior work. | $50,000 |
| Jan 26, 2023 | Completed final sign-off Sep 2023 | 2230 Francisco St | one kitchen remodel- like for like, no walls or layout changeDetails
one kitchen remodel- like for like, no walls or layout change | $20,000 |
| Jan 10, 2023 | Completed final sign-off Sep 2023 | 37 Alma St | kitchen and bath remodel. demo kitchen, modify load bearing wall, increase powder room to full bath shower onlyDetails
kitchen and bath remodel. demo kitchen, modify load bearing wall, increase powder room to full bath shower only | $150,000 |
| Dec 28, 2022 | Completed final sign-off Aug 2024 | 2266 48th Av | interior remodel in 2n floor: remodel extg kitchen and powder roomDetails
interior remodel in 2n floor: remodel extg kitchen and powder room | $18,000 |
| Dec 5, 2022 | Never finaled issued Dec 2022, no final | 94 Uranus Tr | revision to permit 202211307364 removing one bathroom remodel from the scope. now only (1) bathroom & (1) kitchen inkind.Details
revision to permit 202211307364 removing one bathroom remodel from the scope. now only (1) bathroom & (1) kitchen inkind. | |
| Nov 30, 2022 | Never finaled issued Nov 2022, no final | 94 Uranus Tr | one kitchen and two bathroom like for like no walls or layout change, 1 shower panDetails
one kitchen and two bathroom like for like no walls or layout change, 1 shower pan | $50,000 |
| Nov 3, 2022 | Expired or cancelled expired Mar 2026 | 401 Anderson St | interior remodel 1st fl, add a master bedroom, media room with wet bar, family room, full bath. 2nd fl: remodel kitchen, bath, relocate interior stairDetails
interior remodel 1st fl, add a master bedroom, media room with wet bar, family room, full bath. 2nd fl: remodel kitchen, bath, relocate interior stair | $100,000 |
| Oct 27, 2022 | Completed final sign-off May 2023 | 39 Downey St | no changes to exterior/other levels, demo (e) kitchen, new kitchen, demo (e) bathroom x2 new bathrooms, new non-load bearing partitions, new finishes and fixtures in area of remodelDetails
no changes to exterior/other levels, demo (e) kitchen, new kitchen, demo (e) bathroom x2 new bathrooms, new non-load bearing partitions, new finishes and fixtures in area of remodel | $60,000 |
| Oct 25, 2022 | Completed final sign-off Sep 2023 | 2480 15th St | unit 2 - 2/f: remove non-load bearing wall between kitchen and living room. remodel kitchen: new appliances, cabinets, fixtures, elec & plumbing.Details
unit 2 - 2/f: remove non-load bearing wall between kitchen and living room. remodel kitchen: new appliances, cabinets, fixtures, elec & plumbing. | $29,000 |
| Oct 17, 2022 | Completed final sign-off Dec 2022 | 650 Chestnut St | 1 ccomplete kitchen remodel like for like : 5 new recessed lights. no walls or layout change.Details
1 ccomplete kitchen remodel like for like : 5 new recessed lights. no walls or layout change. | $30,000 |
| Oct 3, 2022 | Completed final sign-off Sep 2023 | 2480 15th St | 1 kitchen remodel like for like, no wall or layout changeDetails
1 kitchen remodel like for like, no wall or layout change | $20,000 |
| Sep 14, 2022 | Never finaled issued Sep 2022, no final | 1495 31st Av | one kitchen remodeling like for like, no relocation involved. replace kitchen cabinets, replace appliances, run dedicated circuits per code, install recess lights in kitchen area.Details
one kitchen remodeling like for like, no relocation involved. replace kitchen cabinets, replace appliances, run dedicated circuits per code, install recess lights in kitchen area. | $25,000 |
| Aug 18, 2022 | Completed final sign-off Nov 2022 | 818 Rhode Island St | complete kitchen remodel like for like.Details
complete kitchen remodel like for like. | $20,000 |
| Jul 14, 2022 | Completed final sign-off Jan 2023 | 875 Indiana St | unit 324: 1 bathroom remodel like for like, install new tile and round tub, and new vanity. 1 kitchen remodel like for like new cabinets, no walls or layout change.Details
unit 324: 1 bathroom remodel like for like, install new tile and round tub, and new vanity. 1 kitchen remodel like for like new cabinets, no walls or layout change. | $35,000 |
| Jun 24, 2022 | Completed final sign-off Oct 2022 | 2135 24th Av | complete kitchen and (1) bathroom remodel like for like, no walls or layout change. tubb to tub.Details
complete kitchen and (1) bathroom remodel like for like, no walls or layout change. tubb to tub. | $20,000 |
| Jun 10, 2022 | Never finaled issued Aug 2022, no final | 946 Stockton St | non-structural interior remodel to kitchenDetails
non-structural interior remodel to kitchen | $12,500 |
| May 9, 2022 | Completed final sign-off Jul 2022 | 690 Arguello Bl | complete one kitchen remodel like for like. no walls or layout change.Details
complete one kitchen remodel like for like. no walls or layout change. | $30,000 |
| Mar 25, 2022 | Completed final sign-off Apr 2023 | 2628 Leavenworth St | kitchen remodel work includes new openings in existing walls. new window at side; new kitchen layout. new finishes, new lighting and electrical in kitchen area.Details
kitchen remodel work includes new openings in existing walls. new window at side; new kitchen layout. new finishes, new lighting and electrical in kitchen area. | $20,000 |
| Jan 21, 2022 | Never finaled issued Jan 2022, no final | 999 Green St | unit 1104: remodel, demo/replace bath, move non-load bearing partition @ mater closet, add new washer/dryer, replace interior doors in-kind, remodel kitchen. window wall replacement of ne facade. no new square footage, no expansion.Details
unit 1104: remodel, demo/replace bath, move non-load bearing partition @ mater closet, add new washer/dryer, replace interior doors in-kind, remodel kitchen. window wall replacement of ne facade. no new square footage, no expansion. | $22,000 |
| Dec 9, 2021 | Completed final sign-off Jun 2022 | 615 06th Av | kitchen relocation with a structurl wall removal, adding a powder roomDetails
kitchen relocation with a structurl wall removal, adding a powder room | $60,000 |
| Nov 4, 2021 | Completed final sign-off Jun 2025 | 1335 Filbert St | one bathroom remodel like for like, no walls or layout changes. 16 led lights with new sub panel box in the unit. one kitchen remodel like for like, no walls or layout chnage.Details
one bathroom remodel like for like, no walls or layout changes. 16 led lights with new sub panel box in the unit. one kitchen remodel like for like, no walls or layout chnage. | $30,000 |
| Oct 13, 2021 | Completed final sign-off Jul 2022 | 3287 Folsom St | kitchen and bathroom remodel. all new appliances, plumbing, new electrical panel will be installed in the (e) panel location; replacement of wood flooring living room, kitchen & hallDetails
kitchen and bathroom remodel. all new appliances, plumbing, new electrical panel will be installed in the (e) panel location; replacement of wood flooring living room, kitchen & hall | $35,000 |
| Oct 13, 2021 | Completed final sign-off Dec 2021 | 1575 Funston Av | one kitchen remodel like for like. no walls or layout change, sub panel upgrade 100-200 ampDetails
one kitchen remodel like for like. no walls or layout change, sub panel upgrade 100-200 amp | $2,000 |
| Oct 13, 2021 | Completed final sign-off Jul 2022 | 2090 Pacific Av | one bath remodel like for like and one kitchen remodel like for like. no walls or layout change.Details
one bath remodel like for like and one kitchen remodel like for like. no walls or layout change. | $35,000 |
| Sep 8, 2021 | Completed final sign-off Feb 2022 | 2720 Anza St | kitchen remodel like for like. replace appliances. replace plumbing fixtures. upgrade subpanel. replace hood. no removal of wallsDetails
kitchen remodel like for like. replace appliances. replace plumbing fixtures. upgrade subpanel. replace hood. no removal of walls | $20,000 |
| Aug 16, 2021 | Never finaled issued Mar 2023, no final | 1073 Church St | 1. interior remodel of lower floor to be attached adu: - new kitchen, living area, two bedrooms and two bathrooms; - relocation of water heater and furnace to the basement; 2. remodel of the rear staircase connecting the main unit and adu; 3. replace/retrofit the existing masonry foundationDetails
1. interior remodel of lower floor to be attached adu: - new kitchen, living area, two bedrooms and two bathrooms; - relocation of water heater and furnace to the basement; 2. remodel of the rear staircase connecting the main unit and adu; 3. replace/retrofit the existing masonry foundation | $112,000 |
| Jul 22, 2021 | Completed final sign-off Feb 2022 | 923 Oak St | kitchen remodel: new finishes, casework & relocation to sink. bathroom & powder room remodel: new fixtures finishes, no change to layout. no structure work. no exterior change.Details
kitchen remodel: new finishes, casework & relocation to sink. bathroom & powder room remodel: new fixtures finishes, no change to layout. no structure work. no exterior change. | $20,000 |
| Jun 15, 2021 | Completed final sign-off Dec 2021 | 101 Crescent Wy | #2409: bathroom remodeling like for like. replace plumbing fixtures, update e/m/p up to code 2 new recessed lights, replace fan, 4 new recessed lights at the kitchenDetails
#2409: bathroom remodeling like for like. replace plumbing fixtures, update e/m/p up to code 2 new recessed lights, replace fan, 4 new recessed lights at the kitchen | $38,000 |
| Jun 2, 2021 | Completed final sign-off Aug 2021 | 15 Teresita Bl | kitchen remodeling like for like. update e/m/p up to code. replace plumbing fixtures, appliances.Details
kitchen remodeling like for like. update e/m/p up to code. replace plumbing fixtures, appliances. | $24,000 |
| May 13, 2021 | Completed final sign-off Jan 2022 | 500 Noriega St | complete two bathrooms remodel like for like. complete kitchen remodel like for like. master bathroom is a shower. hallway bathroom is tub.Details
complete two bathrooms remodel like for like. complete kitchen remodel like for like. master bathroom is a shower. hallway bathroom is tub. | $45,000 |
| Apr 2, 2021 | Expired or cancelled cancelled Feb 2026 | 471 Duncan St | 2/f: interior remodel includes kitchen remodel. reconfiguration of (e) appliances, new casework, new countertops, new instant hot water dispenser, new interior non bearing partition, new interior door. no structural work. no exterior change.Details
2/f: interior remodel includes kitchen remodel. reconfiguration of (e) appliances, new casework, new countertops, new instant hot water dispenser, new interior non bearing partition, new interior door. no structural work. no exterior change. | $10,000 |
| Mar 18, 2021 | Expired or cancelled cancelled Jan 2026 | 888 Darien Wy | revision to pa# 201910174865. includes (n) side walkway for 1st fl & 1-hr fire rated guardrail. kitchen skylight call out removed (kitchen skylight will remain). add door on 2nd fl closet by (e) bathroom. updated 1st fl layout as per as-built conditions.Details
revision to pa# 201910174865. includes (n) side walkway for 1st fl & 1-hr fire rated guardrail. kitchen skylight call out removed (kitchen skylight will remain). add door on 2nd fl closet by (e) bathroom. updated 1st fl layout as per as-built conditions. | $15,000 |
| Jan 13, 2021 | Never finaled issued May 2021, no final | 1353 17th Av | renovation of 1st floor and basement floor. kitchen remodel, relocation of internal staircaseDetails
renovation of 1st floor and basement floor. kitchen remodel, relocation of internal staircase | $200,000 |
| Dec 23, 2020 | Never finaled issued Dec 2020, no final | 337 Monterey Bl | unit #337: 1 complete bathroom remodel & shower pan. unit #339: complete kitchen & bathroom remodel, shower pan. like for like, no wall or layout change.Details
unit #337: 1 complete bathroom remodel & shower pan. unit #339: complete kitchen & bathroom remodel, shower pan. like for like, no wall or layout change. | $65,000 |
| Oct 5, 2020 | Expired or cancelled expired Apr 2026 | 241 Liberty St | remodeling of entire floor including kitchens and bathroom. replacing plumbing and fixtures, rewiring, drywall, tiling, cabinets and countertops, interior doors and door casings, baseboards, flooring and painting and installing insulation.Details
remodeling of entire floor including kitchens and bathroom. replacing plumbing and fixtures, rewiring, drywall, tiling, cabinets and countertops, interior doors and door casings, baseboards, flooring and painting and installing insulation. | $68,000 |
| Sep 24, 2020 | Never finaled issued Oct 2020, no final | 245 Randall St | removing wall between kitchen & living room on 2nd floor.Details
removing wall between kitchen & living room on 2nd floor. | $12,000 |
| Aug 28, 2020 | Completed final sign-off May 2023 | 411 Burnett Av | complete kitchen remodel like for like, 130 sq ft, no layout structural changes, no opening changeDetails
complete kitchen remodel like for like, 130 sq ft, no layout structural changes, no opening change | $9,000 |
| Jul 10, 2020 | Completed final sign-off Feb 2025 | 80 06th Av | only demo of kitchen & bathroom. 800sf demo only. reconstruction will be under separate permit.Details
only demo of kitchen & bathroom. 800sf demo only. reconstruction will be under separate permit. | $8,000 |
| Mar 13, 2020 | Completed final sign-off Feb 2021 | 412 Connecticut St | kitchen remodel, like for likeDetails
kitchen remodel, like for like | $8,000 |
| Mar 2, 2020 | Completed final sign-off Feb 2021 | 415 Cornwall St | 1st floor:interior remodel to legalize a family room, a bedroom, a bathroom. 2nd floor:remodel extg kitchen, add a powder room. 3rd fl:remodel bathoom, add a bathroom, convert rear roof to a deck.Details
1st floor:interior remodel to legalize a family room, a bedroom, a bathroom. 2nd floor:remodel extg kitchen, add a powder room. 3rd fl:remodel bathoom, add a bathroom, convert rear roof to a deck. | $100,000 |
| Feb 11, 2020 | Never finaled issued Feb 2020, no final | 30 Abbey St | revision of pa #201912129343. reduce scope of work there will be no kitchen remodelDetails
revision of pa #201912129343. reduce scope of work there will be no kitchen remodel | |
| Dec 17, 2019 | Never finaled issued Dec 2019, no final | 1642 24th Av | relocate kitchen and dining room remodel on 2nd flDetails
relocate kitchen and dining room remodel on 2nd fl | $20,000 |
| Dec 12, 2019 | Completed final sign-off Jun 2020 | 30 Abbey St | master bathroom remodel like for like. kitchen remodel - add island counter top, backsplash, electrical outlets (35 sq ft). no structurial workDetails
master bathroom remodel like for like. kitchen remodel - add island counter top, backsplash, electrical outlets (35 sq ft). no structurial work | $5,000 |
| Nov 27, 2019 | Completed final sign-off Jan 2020 | 256 17th Av | bathroom remodel, like for like. kitchen refrigerator w/ water line. no structural work. comply w/ cec 150.0 k 3 150.0 k 5Details
bathroom remodel, like for like. kitchen refrigerator w/ water line. no structural work. comply w/ cec 150.0 k 3 150.0 k 5 | $5,000 |
| Nov 13, 2019 | Completed final sign-off Jun 2022 | 2412 Lake St | 1st fl convert e space to guest bedroom, family rm, full bath. 2nd fl remodel kitchen, powder rm, 3rd fl remodel bath, add full bath, 4 dormers. rear stairDetails
1st fl convert e space to guest bedroom, family rm, full bath. 2nd fl remodel kitchen, powder rm, 3rd fl remodel bath, add full bath, 4 dormers. rear stair | $80,000 |
| Oct 17, 2019 | Completed final sign-off Aug 2021 | 888 Darien Wy | remove non bearing wall at 2nd fl. remodel e kitchen, 2nd fl. add new bathDetails
remove non bearing wall at 2nd fl. remodel e kitchen, 2nd fl. add new bath | $10,000 |
| Aug 19, 2019 | Never finaled issued Aug 2019, no final | 1941 Noriega St | unit 8: remodel 2 complete bathrooms & 1 kitchen, like for like.Details
unit 8: remodel 2 complete bathrooms & 1 kitchen, like for like. | $12,000 |
| Aug 6, 2019 | Completed final sign-off Oct 2020 | 270 Prospect Av | level2: add bedroom by reducing size of living room, eliminate extg powder room to add full bath, remodel extg kitchen and full bath. no work on level 1Details
level2: add bedroom by reducing size of living room, eliminate extg powder room to add full bath, remodel extg kitchen and full bath. no work on level 1 | $70,001 |
| Jun 21, 2019 | Completed final sign-off Feb 2021 | 415 Cornwall St | kitchen and bathroom remodel and exploratory removal of drywall interior walls, approx 150 sq ft.Details
kitchen and bathroom remodel and exploratory removal of drywall interior walls, approx 150 sq ft. | $2,500 |
| Jun 13, 2019 | Never finaled issued Jun 2019, no final | 529 Baker St | kitchen remodel. complete remodel like to like, 10' x 12'Details
kitchen remodel. complete remodel like to like, 10' x 12' | $10,000 |
| May 17, 2019 | Expired or cancelled expired Sep 2024 | 1295 Page St | kitchen remodel. change of use of the 3rd unit(currently commercial) to residentialDetails
kitchen remodel. change of use of the 3rd unit(currently commercial) to residential | $20,000 |
| May 1, 2019 | Completed final sign-off Sep 2019 | 1733 Hayes St | kitchen remodel, like for likeDetails
kitchen remodel, like for like | $12,000 |