Property Renovation Experts Llc
- Based in
- Rancho Cordova
- On San Francisco permits
- Dec 2024 to Aug 2026
- Last 24 months
- 10 permits filed
10 permits since 2000: 7 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 2 in progress. Typically 0 days from filing to permit and 28 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | Completed final sign-off Oct 2026 | 162 Beaumont Av | repairing 30% of ext front staircase, like for like. no structural work. 15 total steps. repairing 4 total and fixing wood underneath.Details
repairing 30% of ext front staircase, like for like. no structural work. 15 total steps. repairing 4 total and fixing wood underneath. | $2,000 |
| Jan 14, 2026 | Completed final sign-off Feb 2026 | 1333 Hayes St | board at lower portion of guardrail to be removed and replaced with new, like for like. replace 18 steps, like for like. 40% of stairs. located at front of building.Details
board at lower portion of guardrail to be removed and replaced with new, like for like. replace 18 steps, like for like. 40% of stairs. located at front of building. | $12,300 |
| Jan 13, 2026 | Completed final sign-off Feb 2026 | 823 Shrader St | 1) replace 6 steps damaged and rotted lumber. 2)replace 8 ft handrails damaged on rotted lumber. all work at back yard aprox. 30% stair. replace in-kind.Details
1) replace 6 steps damaged and rotted lumber. 2)replace 8 ft handrails damaged on rotted lumber. all work at back yard aprox. 30% stair. replace in-kind. | $13,100 |
| Nov 5, 2025 | In progress issued Nov 2025 | 3310 16th St | exterior deck and stair repairs, less 50%, in the back of building. common area. non street facing in kindDetails
exterior deck and stair repairs, less 50%, in the back of building. common area. non street facing in kind | $28,000 |
| Mar 10, 2025 | In progress issued Mar 2025 | 888 Peru Av | replacement of the steps at entrance, and replacement of internal stairs, repairs as needed-non structural change less than 50%.Details
replacement of the steps at entrance, and replacement of internal stairs, repairs as needed-non structural change less than 50%. | $5,000 |