Pro Design Build And Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2025 to Oct 2026
- Last 24 months
- 9 permits filed
9 permits since 2000: 1 completed, 8 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 5
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Kitchen remodel permits
6 kitchen remodel permits: 1 completed, 5 in progress. Typically 3 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2026 | In progress issued Oct 2026 | 1775 31st Av | revision to permit#202610239844, reduce 2 kitchens to 1 kitchen only. remaining scope to pa#: 2026-1023-9844 to remain the same.Details
revision to permit#202610239844, reduce 2 kitchens to 1 kitchen only. remaining scope to pa#: 2026-1023-9844 to remain the same. | |
| Oct 23, 2026 | In progress issued Oct 2026 | 1775 31st Av | to comply with nov #202654587: repair fire-damaged (2) bathrooms, (2) kitchens, replace sheetrock throughout. no penalty. drh. it is a sfd+adu; build back lik-for-like.Details
to comply with nov #202654587: repair fire-damaged (2) bathrooms, (2) kitchens, replace sheetrock throughout. no penalty. drh. it is a sfd+adu; build back lik-for-like. | $150,000 |
| Aug 7, 2026 | In progress issued Aug 2026 | 30 Elmhurst Dr | at 1st floor: remodel existing floor space to bedroom, bath, family, and laundry; remodel kitchen and dining. at 2nd floor remodel existing bath to 2 new bathrooms. remodel existing master bathroom.Details
at 1st floor: remodel existing floor space to bedroom, bath, family, and laundry; remodel kitchen and dining. at 2nd floor remodel existing bath to 2 new bathrooms. remodel existing master bathroom. | $98,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 62 Aquavista Wy | revision to 202512010673 at 1st/f change bath layout, relocate closet per plan, new patio. 2nd/f: change kitchen & bath configuration per plan, replace all e) windows and add new skylightsDetails
revision to 202512010673 at 1st/f change bath layout, relocate closet per plan, new patio. 2nd/f: change kitchen & bath configuration per plan, replace all e) windows and add new skylights | $14,000 |
| Apr 30, 2026 | Completed final sign-off Oct 2026 | 268 12th Av | comply with nov # 202653022, replace bathroom tub & fixture, new stone surround installed. kitchen counter replaced & sink replaced.Details
comply with nov # 202653022, replace bathroom tub & fixture, new stone surround installed. kitchen counter replaced & sink replaced. | $2,500 |
| Dec 1, 2025 | In progress issued Jan 2026 | 62 Aquavista Wy | 1/f: remodel (e) space to laundry/wetbar, family bathrooms and bedrooms. 2/f: remodel (e) kitchen and bathroom. interior remodel only.Details
1/f: remodel (e) space to laundry/wetbar, family bathrooms and bedrooms. 2/f: remodel (e) kitchen and bathroom. interior remodel only. | $187,000 |