Presidio Builders
- Based in
- San Francisco
- On San Francisco permits
- Feb 2010 to Aug 2015
- Last 24 months
- 0 permits filed
27 permits since 2000: 18 completed, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 130 days from filing to permit and 324 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 16, 2014 | Completed final sign-off Aug 2015 | 1722 Taraval St | revision to app#201311272968. install new larger door at restroom, remove at relocate extg sink and mirror, & towel dispenser. install new grab bar at toilet and relocate extg side grab bar. install new 42" gaurdrail at e stairs @ new handrails extg side.Details
revision to app#201311272968. install new larger door at restroom, remove at relocate extg sink and mirror, & towel dispenser. install new grab bar at toilet and relocate extg side grab bar. install new 42" gaurdrail at e stairs @ new handrails extg side. | $6,000 |
| May 17, 2013 | Completed final sign-off Apr 2014 | 426 Lily St | 50 % replace/repair inkind of existing rear deck and stair.Details
50 % replace/repair inkind of existing rear deck and stair. | $10,000 |