Back to kitchen remodel contractors
Precision Pacific Const
- Based in
- San Carlos
- On San Francisco permits
- Feb 2003 to Aug 2015
- Last 24 months
- 0 permits filed
10 permits since 2000: 8 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 32 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 19, 2012 | Completed final sign-off Aug 2012 | 50 De Soto St | relocate existing bath on 2nd fl. remodel masterbath on 2nd fl. reconfigure closets, add solar tubes at ceiling, general mep upgrades, replace kitchen cabinet, new lighting. no structural bearing walls affected.Details
relocate existing bath on 2nd fl. remodel masterbath on 2nd fl. reconfigure closets, add solar tubes at ceiling, general mep upgrades, replace kitchen cabinet, new lighting. no structural bearing walls affected. | $18,500 |
| Sep 9, 2011 | Completed final sign-off Dec 2011 | 48 Fairfield Wy | remodel kitchen, remove non-bearing walls. no structural workDetails
remodel kitchen, remove non-bearing walls. no structural work | $9,239 |