Back to bathroom remodel contractors
Precision General Contruction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Jul 2026
- Last 24 months
- 13 permits filed
37 permits since 2000: 24 completed, 7 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 9 completed, 5 in progress, 1 never finaled. Typically 22 days from filing to permit and 279 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2026 | In progress issued Jul 2026 | 1819 08th Av | 2nd flr - kitchen remodel + (n) window. (n) half bath. remove (e) deck+stairs; build (n) deck + stairs. replace kitchen roof w/ (n) pitched roof. 3rd fl - (n) laundry closet. new skylight. replace bedrm..Details
2nd flr - kitchen remodel + (n) window. (n) half bath. remove (e) deck+stairs; build (n) deck + stairs. replace kitchen roof w/ (n) pitched roof. 3rd fl - (n) laundry closet. new skylight. replace bedrm.. | $100,000 |
| May 22, 2025 | In progress issued Jun 2025 | 139 09th Av | revision to pemit app#202502059736 for added awork, rear remodel portion of upper level, unit 139 including kitchen and bathroom.Details
revision to pemit app#202502059736 for added awork, rear remodel portion of upper level, unit 139 including kitchen and bathroom. | $150,000 |
| Mar 11, 2025 | Completed final sign-off Dec 2025 | 750 Presidio Av | unit #202, 3/f: bathroom remodel, and install sub water meters in unit #202.Details
unit #202, 3/f: bathroom remodel, and install sub water meters in unit #202. | $20,000 |
| Feb 5, 2025 | In progress issued Mar 2025 | 141 09th Av | remodel rear portion of unit 141 including new kitchen and bath. convert rear portion of garage to habitable space. connect 1st story to 2nd fl with new interior stairDetails
remodel rear portion of unit 141 including new kitchen and bath. convert rear portion of garage to habitable space. connect 1st story to 2nd fl with new interior stair | $251,000 |
| Jan 23, 2025 | In progress issued Jan 2025 | 3121 Broderick St | unit 3: kitchen cabinet replacement and bathroom tile replacement.Details
unit 3: kitchen cabinet replacement and bathroom tile replacement. | $25,000 |
| Dec 18, 2024 | Completed final sign-off Sep 2025 | 750 Presidio Av | unit#305: bathroom remodeling with water shut off valves and install sub water meters in the unit#305Details
unit#305: bathroom remodeling with water shut off valves and install sub water meters in the unit#305 | $10,000 |
| Jan 11, 2024 | Completed final sign-off Jul 2025 | 290 Saint Charles Av | convert (e) inhabitable space on first flr to additional habitable space within the exsiting dwelling unit with - one bedroom, one living room, one tow-burner stove and one bath. relocated gas meter. relocate and upgrade elect meter to 200 amp. relocate (e) tank less water heater.Details
convert (e) inhabitable space on first flr to additional habitable space within the exsiting dwelling unit with - one bedroom, one living room, one tow-burner stove and one bath. relocated gas meter. relocate and upgrade elect meter to 200 amp. relocate (e) tank less water heater. | $100,000 |
| Jan 8, 2024 | Completed final sign-off Mar 2026 | 1575 43rd Av | convert (e) storage area on lower floor to 831 sf gf (n) habitable area. infill 40 sf of area at left property line. remove (e) stair at left side of bldg. reconfigure internal stair to lower level. add (n) bathroom at main level.Details
convert (e) storage area on lower floor to 831 sf gf (n) habitable area. infill 40 sf of area at left property line. remove (e) stair at left side of bldg. reconfigure internal stair to lower level. add (n) bathroom at main level. | $150,000 |
| Sep 19, 2023 | In progress issued Nov 2023 | 4145 20th St | unit 4147 20th st: (2) new windows and (2) new doors (facing rear). plumbing and electrical as required by above scope. revison to (e) bathroom, kitchen, and dining area.Details
unit 4147 20th st: (2) new windows and (2) new doors (facing rear). plumbing and electrical as required by above scope. revison to (e) bathroom, kitchen, and dining area. | $136,000 |
| Aug 23, 2023 | Never finaled issued Sep 2023, no final | 4145 20th St | 1st fl bedroom addition & sitting area on ground fl within (e) envelope for unit 4145 20th st. 2nd fl bathroom addition, renovation of bedroom at 4145 20th st. eletrical & plumbing as reqDetails
1st fl bedroom addition & sitting area on ground fl within (e) envelope for unit 4145 20th st. 2nd fl bathroom addition, renovation of bedroom at 4145 20th st. eletrical & plumbing as req | $200,000 |
| Jun 23, 2023 | Completed final sign-off Aug 2024 | 2515 26th Av | 1/f: add 1 br,closet,bath,entertainment room and laundry. reconfig (e) bed, bathroomand closet; relocate w/h and furnace to garage; 2/f: add (n) 2/f deck with staircase to rear yard; reconfig location of itnerior staircase; 2/f: remodel and relocate (e) living room, kitchen and dining; int. remodelDetails
1/f: add 1 br,closet,bath,entertainment room and laundry. reconfig (e) bed, bathroomand closet; relocate w/h and furnace to garage; 2/f: add (n) 2/f deck with staircase to rear yard; reconfig location of itnerior staircase; 2/f: remodel and relocate (e) living room, kitchen and dining; int. remodel | $100,000 |
| Dec 5, 2022 | Completed final sign-off Mar 2023 | 2471 38th Av | bathroom remodel on 2nd floor.Details
bathroom remodel on 2nd floor. | $6,500 |
| Sep 28, 2022 | Completed final sign-off Sep 2022 | 230 Collingwood St | administrate permit to reflect floor plan changes to permit 2019-0829-0195, 20200128-2912, and 2019-1004-3639 revise laundry room location at unit 230 from 2nd story to first revise bathroom plans at unit 2308 232 to eliminate bathroomsDetails
administrate permit to reflect floor plan changes to permit 2019-0829-0195, 20200128-2912, and 2019-1004-3639 revise laundry room location at unit 230 from 2nd story to first revise bathroom plans at unit 2308 232 to eliminate bathrooms | |
| Oct 14, 2021 | Completed final sign-off Jun 2022 | 109 Gladeview Wy | remodel of ground floor to include new bathroom, home office & playroom with wet bar. aprox 410sf of new habitable space. replace/add windows in rear per plans. relocate laundry & furnace.Details
remodel of ground floor to include new bathroom, home office & playroom with wet bar. aprox 410sf of new habitable space. replace/add windows in rear per plans. relocate laundry & furnace. | $85,000 |
| Feb 1, 2021 | Completed final sign-off Apr 2022 | 483 30th St | revision to pa 201808026244. reduce horizontal addition at 1st, 2nd, 3rd floors. eliminate one proposed bath at 3rd floor. eliminate excavation greater than 5 feet deep.Details
revision to pa 201808026244. reduce horizontal addition at 1st, 2nd, 3rd floors. eliminate one proposed bath at 3rd floor. eliminate excavation greater than 5 feet deep. |