Poza Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2023 to Aug 2026
- Last 24 months
- 15 permits filed
21 permits since 2000: 12 completed, 9 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 2 in progress. Typically 7 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2026 | In progress filed Aug 2026, not yet issued | 1647 39th Av | renovate(e) garage spacecreat family room area to include bathroom, vif in field that ceiling & wall assembly meet 1 hour requirement per code. install new windows & door at rear facade for light & air requirements per code. no work proposed at 2nd floor. relocate (e) wh & furnace.Details
renovate(e) garage spacecreat family room area to include bathroom, vif in field that ceiling & wall assembly meet 1 hour requirement per code. install new windows & door at rear facade for light & air requirements per code. no work proposed at 2nd floor. relocate (e) wh & furnace. | $55,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 2860 Pine St | leak repairs: minor dry rot repairs to siding & parapet, rook repairs. paint touch up. no change to look. unit 2860 - install bath fan due to mildew build up. exhaust shall terminate min 5'-0" from property line. not visible from street.Details
leak repairs: minor dry rot repairs to siding & parapet, rook repairs. paint touch up. no change to look. unit 2860 - install bath fan due to mildew build up. exhaust shall terminate min 5'-0" from property line. not visible from street. | $10,000 |
| May 28, 2025 | Completed final sign-off Jun 2025 | 5010 Geary Bl | revision to 202402286724 for bathroom, kitchens and hot water heater layouts.Details
revision to 202402286724 for bathroom, kitchens and hot water heater layouts. | |
| May 21, 2025 | Completed final sign-off Sep 2025 | 62 Ina Ct | (e) bathroom remodel. replumb all fixtures with new piping (sink, toilet, shower), new tile, and heated floor. new lighting and code compliant outlets. existing house electrical panel has space to accomodate electrical changes.Details
(e) bathroom remodel. replumb all fixtures with new piping (sink, toilet, shower), new tile, and heated floor. new lighting and code compliant outlets. existing house electrical panel has space to accomodate electrical changes. | $30,000 |
| Feb 28, 2024 | Completed final sign-off Jun 2025 | 5010 Geary Bl | renovation of 4 existing units. selective demo. remodel bathrooms, kitchens, living rooms, bedroomsDetails
renovation of 4 existing units. selective demo. remodel bathrooms, kitchens, living rooms, bedrooms | $75,000 |
| Feb 28, 2024 | Completed final sign-off Mar 2025 | 5026 Geary Bl | renovation of 2 existing units. selective demo and remodel of baths, kitchens, bedrooms,living roomsDetails
renovation of 2 existing units. selective demo and remodel of baths, kitchens, bedrooms,living rooms | $65,000 |