Portrait Homes Inc
- Based in
- Corona
- On San Francisco permits
- Feb 2010 to Jan 2013
- Last 24 months
- 0 permits filed
67 permits since 2000: 59 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 283 days from filing to permit and 254 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2011 | Completed final sign-off Dec 2013 | 1680 Eddy St | remove 2 non conforming stairs and 1 non complying ramp and replace with 2 new exterior stairs and 1 ramp with handrailsDetails
remove 2 non conforming stairs and 1 non complying ramp and replace with 2 new exterior stairs and 1 ramp with handrails | $4,000 |
| Oct 8, 2010 | Completed final sign-off Sep 2011 | 1680 Eddy St | renovation of (e) community bldg bathrooms, offices, kitchen at 2nd floor, new windows to replace (e) at 2nd floor. new hvac, plumbing, electrical, new exterior stair to repair (e) stair. no work at ground fl, no work in public way. (n)accessible ramp to replace existing non-complying ramp.Details
renovation of (e) community bldg bathrooms, offices, kitchen at 2nd floor, new windows to replace (e) at 2nd floor. new hvac, plumbing, electrical, new exterior stair to repair (e) stair. no work at ground fl, no work in public way. (n)accessible ramp to replace existing non-complying ramp. | $600,000 |