Back to kitchen remodel contractors
Portola Design Build Interiors Developme
- Based in
- Danville
- On San Francisco permits
- Nov 2012 to Mar 2021
- Last 24 months
- 0 permits filed
8 permits since 2000: 3 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 never finaled. Typically 176 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2020 | Never finaled issued Jan 2021, no final | 112 Jordan Av | interior remodel of an existing sfd. kitchen remodel as well as remodel upstairs bedrooms, new windows and doors in same location. remove (3) brick chimmey & firplaces, add (1) full bath, relocate (2) baths, remove 2 office upstairs.Details
interior remodel of an existing sfd. kitchen remodel as well as remodel upstairs bedrooms, new windows and doors in same location. remove (3) brick chimmey & firplaces, add (1) full bath, relocate (2) baths, remove 2 office upstairs. | $200,000 |
| Feb 20, 2014 | Never finaled issued Feb 2014, no final | 761 Tehama St | kitchen and bath remodel with new stairs to loft. maher not requiredDetails
kitchen and bath remodel with new stairs to loft. maher not required | $35,000 |