Back to kitchen remodel contractors
Portillo & Co Dba Summit Hill Builders
- Based in
- San Anselmo
- On San Francisco permits
- Apr 2010 to Jan 2012
- Last 24 months
- 0 permits filed
13 permits since 2000: 4 completed, 9 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 1 completed, 5 expired or cancelled. Typically 0 days from filing to permit and 363 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 11, 2011 | Completed final sign-off Jan 2012 | 1450 Post St | construction of new partition wall in unit 206 creating office space in res unit. new bath vanities and kitchenette cabinets. new wahser dryer hookup, elec/plumb. new microwave circuit. replace toielts and plumb for 2 sinks in master bath. provide sprinkler protection in new office on sep permit.Details
construction of new partition wall in unit 206 creating office space in res unit. new bath vanities and kitchenette cabinets. new wahser dryer hookup, elec/plumb. new microwave circuit. replace toielts and plumb for 2 sinks in master bath. provide sprinkler protection in new office on sep permit. | $30,000 |
| Nov 15, 2010 | Expired or cancelled expired Aug 2021 | 1450 Post St | unit #1008-remodel kitchen-new cabinets & appliances, new electrical plugs on deck (gfi), shorten water & waste line, move electrical in kitchen, move wall in living room back to original locationDetails
unit #1008-remodel kitchen-new cabinets & appliances, new electrical plugs on deck (gfi), shorten water & waste line, move electrical in kitchen, move wall in living room back to original location | $43,000 |
| Jul 9, 2010 | Expired or cancelled expired Aug 2021 | 1450 Post St | unit # 704: all work to be performed in unit # 704; replace cabinets in both bathrooms and kitchenette. installation of new faucet and new remodel existing toilets same location. build wall to create office. installation of new recess lighting in office.Details
unit # 704: all work to be performed in unit # 704; replace cabinets in both bathrooms and kitchenette. installation of new faucet and new remodel existing toilets same location. build wall to create office. installation of new recess lighting in office. | $50,000 |
| Apr 22, 2010 | Expired or cancelled expired Aug 2021 | 1450 Post St | work in unit #601: replace kitchen cabinets, move electrical plugs gfi protector, move plumbing for sink, replace bathroom cabinets.Details
work in unit #601: replace kitchen cabinets, move electrical plugs gfi protector, move plumbing for sink, replace bathroom cabinets. | $40,000 |
| Apr 22, 2010 | Expired or cancelled expired Aug 2021 | 1450 Post St | unit # 511: replace/new cabinets in kitchen and bath. move plugs and install gfi'sDetails
unit # 511: replace/new cabinets in kitchen and bath. move plugs and install gfi's | $23,000 |
| Apr 20, 2010 | Expired or cancelled expired Aug 2021 | 1450 Post St | change of kitchen and bathroom cabinets, add plugs , gfi protected move sub panel and add washer/dryer hook up, add plumbing for washer/dryer, remove 17" of kitchen wall to expand size, provide high efficiency lights per cecDetails
change of kitchen and bathroom cabinets, add plugs , gfi protected move sub panel and add washer/dryer hook up, add plumbing for washer/dryer, remove 17" of kitchen wall to expand size, provide high efficiency lights per cec | $35,000 |