Back to kitchen remodel contractors
Porter & Sons Excavating
- Based in
- Grass Valley
- On San Francisco permits
- Dec 2019 to Jan 2022
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 83 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2020 | Completed final sign-off Jan 2021 | 25 Sierra St | 2 bathrm & 1 kitchen renovaiton. convert upstairs built-in tub to walk-in shower, new vanity & sink. downstairs tub replacement, new vanity & sink. new kitchen appli & countertops. new tile in all 3 locations. no structural work. all walls, elec & plumb will remain the same w/upstairs shower pan.Details
2 bathrm & 1 kitchen renovaiton. convert upstairs built-in tub to walk-in shower, new vanity & sink. downstairs tub replacement, new vanity & sink. new kitchen appli & countertops. new tile in all 3 locations. no structural work. all walls, elec & plumb will remain the same w/upstairs shower pan. | $45,000 |