Plazo Construction
- Based in
- Daly City
- On San Francisco permits
- Jan 2008 to Aug 2013
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2013 | Expired or cancelled withdrawn Oct 2013 | 1325 Revere Av | remove extg unapproved wiring and plmbg on kitchen at garage level correct violation #201276841. install a patio door and built a deck and stair. resolve complaint #201276762Details
remove extg unapproved wiring and plmbg on kitchen at garage level correct violation #201276841. install a patio door and built a deck and stair. resolve complaint #201276762 | $4,500 |
| Sep 2, 2008 | Completed final sign-off Aug 2009 | 550 46th Av | remove existing rear stair and build a rear deck & stair.Details
remove existing rear stair and build a rear deck & stair. | $3,000 |
| Jan 29, 2008 | Completed final sign-off Mar 2008 | 1628 Kirkwood Av | all old deck & stair to be replaced in kind. deck and door will be removed on 3rd floor.Details
all old deck & stair to be replaced in kind. deck and door will be removed on 3rd floor. | $5,000 |