Back to kitchen remodel contractors
Planet Builders
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Dec 2017
- Last 24 months
- 0 permits filed
39 permits since 2000: 29 completed, 7 never finaled, 3 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 11 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 314 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2017 | Completed final sign-off Jul 2018 | 1640 09th Av | kitchen remodel, bathroom floor to be raised, rear door to be relocated, skylight addition (flat)Details
kitchen remodel, bathroom floor to be raised, rear door to be relocated, skylight addition (flat) | $35,000 |
| May 25, 2017 | Completed final sign-off Jul 2018 | 1640 09th Av | remove fixtures/tiles at kitchen, baths & utility to discover existing conditions. no structural workDetails
remove fixtures/tiles at kitchen, baths & utility to discover existing conditions. no structural work | $5,000 |
| Apr 26, 2016 | Completed final sign-off Apr 2017 | 785 Lakeview Av | remodel in kind. 3 bedrooms, kitchen, 2 bathrooms. no wall removal, no new walls.Details
remodel in kind. 3 bedrooms, kitchen, 2 bathrooms. no wall removal, no new walls. | $40,000 |
| Oct 10, 2014 | Completed final sign-off Jun 2015 | 427 Buchanan St | remodel kitchen in kind, add 2 bathrooms @ unit 427 and replace existing stud walls to new. revision to pa# 201408194207.Details
remodel kitchen in kind, add 2 bathrooms @ unit 427 and replace existing stud walls to new. revision to pa# 201408194207. | $15,000 |
| Aug 19, 2014 | Never finaled issued Aug 2014, no final | 427 Buchanan St | replace kitchen cabinetes & countertop. replace fixtures & tile in two bathrooms, no changes on walls.Details
replace kitchen cabinetes & countertop. replace fixtures & tile in two bathrooms, no changes on walls. | $40,000 |
| Jun 11, 2013 | Completed final sign-off Jun 2014 | 4013 Folsom St | remodel kitchen & 2 bathrooms. replace in kind-fixtures & cabinetsDetails
remodel kitchen & 2 bathrooms. replace in kind-fixtures & cabinets | $18,000 |
| Jun 18, 2012 | Completed final sign-off Dec 2012 | 429 Buchanan St | remodel 1 bathroom & 1 kitchen, replace in kind, new fixtures & cabinets.Details
remodel 1 bathroom & 1 kitchen, replace in kind, new fixtures & cabinets. | $25,000 |
| Mar 29, 2011 | Completed final sign-off Aug 2011 | 1650 Moraga St | remodel bathroom, replace (e) fixtures & retile bathroom, remove (e) flue, replace with metalestos pipe, reframe skylight, replace kitchen appliances.Details
remodel bathroom, replace (e) fixtures & retile bathroom, remove (e) flue, replace with metalestos pipe, reframe skylight, replace kitchen appliances. | $25,000 |
| Apr 6, 2010 | Completed final sign-off Nov 2011 | 357 07th Av | infill (e) light well. install new steel beam in grg. replace posts and portion of rear foundation. enclose guest room. relocate int.stairs and bathrm at guest rm. on 2nd and 3rd fl remove hall/ wall to expand kitchen. build bathroom. build patio on grade.Details
infill (e) light well. install new steel beam in grg. replace posts and portion of rear foundation. enclose guest room. relocate int.stairs and bathrm at guest rm. on 2nd and 3rd fl remove hall/ wall to expand kitchen. build bathroom. build patio on grade. | $40,000 |
| Nov 16, 2009 | Completed final sign-off Nov 2011 | 357 07th Av | remodel kitchen and bathrooms layout unchanged. remove brick chimney/flu, patch roof. install temporary construction fence. min. 50% of kitchen lighting wattage shall be of hight efficency lights. provide high efficancy lights or mannual on occupancy sensor in bathroom.Details
remodel kitchen and bathrooms layout unchanged. remove brick chimney/flu, patch roof. install temporary construction fence. min. 50% of kitchen lighting wattage shall be of hight efficency lights. provide high efficancy lights or mannual on occupancy sensor in bathroom. | $27,000 |
| Jul 30, 2009 | Expired or cancelled withdrawn Sep 2009 | 394 Joost Av | addition of (n) third-story at rear third of the building for new master suite. new windows and and doors. reconditioned (e) stucco siding new wood w/rainscreen siding.interior renovation of (e) kitchen, bathroom and living areas. new roofing at upper floors. new fencing and landscaping in rr yd.Details
addition of (n) third-story at rear third of the building for new master suite. new windows and and doors. reconditioned (e) stucco siding new wood w/rainscreen siding.interior renovation of (e) kitchen, bathroom and living areas. new roofing at upper floors. new fencing and landscaping in rr yd. | $250,000 |
| Apr 23, 2008 | Expired or cancelled expired Dec 2008 | 361 14th Av | kitchen: replace cabinets & fixtures add lighting replace in kind, bathroom, replace fixtures & tileDetails
kitchen: replace cabinets & fixtures add lighting replace in kind, bathroom, replace fixtures & tile | $19,000 |
| Jan 31, 2008 | Completed final sign-off Dec 2008 | 1215 Greenwich St | change kitchen cabinets. make kitchen and kitchen door wider. replace master bath tile floor as part of general interior non structural renovatoin. replace guest bath tile floor. move toilet overDetails
change kitchen cabinets. make kitchen and kitchen door wider. replace master bath tile floor as part of general interior non structural renovatoin. replace guest bath tile floor. move toilet over | $9,000 |
| Feb 10, 2006 | Completed final sign-off Mar 2006 | 414 Shields St | replace cabinets/countertops, upgrade kitchen electrical. kitchen only.Details
replace cabinets/countertops, upgrade kitchen electrical. kitchen only. | $14,000 |