Back to kitchen remodel contractors
Pjcon Inc
- Based in
- Santa Clara
- On San Francisco permits
- Nov 2007 to Dec 2019
- Last 24 months
- 0 permits filed
41 permits since 2000: 22 completed, 15 never finaled, 4 expired or cancelled.
Of the 15 never-finaled permits, 4 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 6 completed, 2 expired or cancelled. Typically 18 days from filing to permit and 352 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2019 | Completed final sign-off Nov 2022 | 126 Henry St | remodel 2 apartments. reconfigure 2 kitchens, renovate bathrooms, add bathroom at 2nd fl, and 2 laundry. replace/relocate windows at lightwell. no work visible from street.Details
remodel 2 apartments. reconfigure 2 kitchens, renovate bathrooms, add bathroom at 2nd fl, and 2 laundry. replace/relocate windows at lightwell. no work visible from street. | $180,000 |
| Dec 11, 2018 | Completed final sign-off Aug 2021 | 638 36th Av | demolish stair in lightwell along w/ deck & stair in rear yard. convert 1st fl bonus room into master bedrm suite. extend (n) master bedrm out under (e) 2nd fl bedrm above. remove 2nd fl kitchen & bathrm. relocate lightwell on east property line. provide (n) interior stair to access 1st flDetails
demolish stair in lightwell along w/ deck & stair in rear yard. convert 1st fl bonus room into master bedrm suite. extend (n) master bedrm out under (e) 2nd fl bedrm above. remove 2nd fl kitchen & bathrm. relocate lightwell on east property line. provide (n) interior stair to access 1st fl | $250,000 |
| Oct 4, 2017 | Completed final sign-off Jan 2018 | 14 Palm Av | install new posts and one new beam at existing interior wall opening at 2nd floor. remove bearing wall between kitchen and living rm.Details
install new posts and one new beam at existing interior wall opening at 2nd floor. remove bearing wall between kitchen and living rm. | $16,000 |
| Jun 30, 2015 | Completed final sign-off Feb 2016 | 550 Lyon St | add new bath with shower & sink, remodel (e) bath, add toilet, remodel kitchen: new cabinets. convert storage into laundry room, replace (e) window with 36x24 double hung awning window, remove plaster, replace with new sheetrock and new insulation throughout. window not visible from street.Details
add new bath with shower & sink, remodel (e) bath, add toilet, remodel kitchen: new cabinets. convert storage into laundry room, replace (e) window with 36x24 double hung awning window, remove plaster, replace with new sheetrock and new insulation throughout. window not visible from street. | $50,000 |
| Jun 30, 2014 | Expired or cancelled expired Jul 2017 | 700 Lake St | change gas stove, hood, counter top in kitchen. change toilet sink, tile in bathroom. no walls moved. all fixture layouts and type to remain unchanged.Details
change gas stove, hood, counter top in kitchen. change toilet sink, tile in bathroom. no walls moved. all fixture layouts and type to remain unchanged. | $31,700 |
| Jul 12, 2012 | Completed final sign-off May 2013 | 260 Dorantes Av | to obtain final inspection for work approved under app#200908144897. all work is complete. original scope of work:rear addtion and interior remodel at all 3 levels. includes kitchen and bathrooms remodels. mepDetails
to obtain final inspection for work approved under app#200908144897. all work is complete. original scope of work:rear addtion and interior remodel at all 3 levels. includes kitchen and bathrooms remodels. mep | |
| May 13, 2011 | Completed final sign-off Jul 2012 | 357 Cumberland St | interior remodel: open main living space by removing walls and adding structural frame, add room (partition) at front of house, remodel kitchen and bathrooms, rearranged bedroom closets.Details
interior remodel: open main living space by removing walls and adding structural frame, add room (partition) at front of house, remodel kitchen and bathrooms, rearranged bedroom closets. | $150,000 |
| Aug 14, 2009 | Expired or cancelled expired Feb 2011 | 260 Dorantes Av | rear addition and interior remodeling on three floors. ground floor remodel ; family room & bathroom. 2nd. flr.: 10' rear addition & kitchen remodel. 3rd. flr.: 10' rear addition, add den, remodel 2-bathroom and closet.Details
rear addition and interior remodeling on three floors. ground floor remodel ; family room & bathroom. 2nd. flr.: 10' rear addition & kitchen remodel. 3rd. flr.: 10' rear addition, add den, remodel 2-bathroom and closet. | $80,000 |