Back to kitchen remodel contractors
Pionic Unit Construction Co
- Based in
- Pacifica
- On San Francisco permits
- Jan 2014 to Feb 2025
- Last 24 months
- 1 permit filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 3 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2018 | Completed final sign-off Jun 2018 | 111 Galewood Cr | (1) kitchen remodel including cabinets, counter tops, electrical & plumbing at 2/f. 2.5 bathroom & toilet remodel including electrical & plumbing at 2/f & 3/f. no change to existing floor plan.Details
(1) kitchen remodel including cabinets, counter tops, electrical & plumbing at 2/f. 2.5 bathroom & toilet remodel including electrical & plumbing at 2/f & 3/f. no change to existing floor plan. | $45,000 |
| Feb 8, 2018 | Completed final sign-off Jun 2018 | 111 Galewood Cr | painting to wall and ceiling at 2nd and 3rd floor. replacement of carpet to hardwood flooring at 2nd and 3rd floors living dining , bedrroms and kitchen. replacement ow all and floor tiles at bathrooms and toilets.Details
painting to wall and ceiling at 2nd and 3rd floor. replacement of carpet to hardwood flooring at 2nd and 3rd floors living dining , bedrroms and kitchen. replacement ow all and floor tiles at bathrooms and toilets. | $38,000 |
| Sep 13, 2017 | Completed final sign-off Apr 2021 | 2158 44th Av | horizontal additon, remodel kitchen area, add one family room, one bath at 1st fl, add master bed and one bath. mech, elec and plumbing under separate permitDetails
horizontal additon, remodel kitchen area, add one family room, one bath at 1st fl, add master bed and one bath. mech, elec and plumbing under separate permit | $180,000 |
| Mar 16, 2015 | Completed final sign-off Oct 2015 | 1531 31st Av | remove partial partition wall, re-arrange kitchen layout, all work at second floor.Details
remove partial partition wall, re-arrange kitchen layout, all work at second floor. | $16,000 |
| Sep 12, 2014 | Completed final sign-off Apr 2015 | 874 33rd Av | renovate of existing duplex: add 1/2 bath and remodel (e) kitchen & bathroom for both units. replace (e) windows at lightwell and rear of the building on 2/f & 3/f.Details
renovate of existing duplex: add 1/2 bath and remodel (e) kitchen & bathroom for both units. replace (e) windows at lightwell and rear of the building on 2/f & 3/f. | $60,000 |