Pinnacle Construction & Maintenance Llc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Dec 2014
- Last 24 months
- 0 permits filed
24 permits since 2000: 20 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 52 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 8, 2014 | Completed final sign-off Nov 2014 | 1780 Mcallister St | repair rear exterior stairs, less than 50%, repair in kind. egress must be maintained during all times of construction.Details
repair rear exterior stairs, less than 50%, repair in kind. egress must be maintained during all times of construction. | $7,000 |
| Sep 13, 2013 | Completed final sign-off May 2014 | 957 Hayes St | unit #2-add bathroom, move w/d, add walk-in closet, remove (e) 9" r/9"tread stair. build new code compliant staircase. remove broken lath & plaster. replace old plaster with new 5/8" gyp board. add bedrooms & denDetails
unit #2-add bathroom, move w/d, add walk-in closet, remove (e) 9" r/9"tread stair. build new code compliant staircase. remove broken lath & plaster. replace old plaster with new 5/8" gyp board. add bedrooms & den | $41,270 |