Back to kitchen remodel contractors
Pineda Construction Inc
- Based in
- Richmond
- On San Francisco permits
- Dec 2016 to Sep 2026
- Last 24 months
- 33 permits filed
124 permits since 2000: 77 completed, 19 in progress, 22 never finaled, 6 expired or cancelled.
Of the 22 never-finaled permits, 10 are 3 to 5 years old, 12 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
32 kitchen remodel permits: 21 completed, 5 in progress, 5 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 290 14th St | unit 4: kitchen and bathroom remodel in kind, update electrical and plumbing in unit. repair walls and ceiling as needed.Details
unit 4: kitchen and bathroom remodel in kind, update electrical and plumbing in unit. repair walls and ceiling as needed. | $35,000 |
| Jun 3, 2026 | Completed final sign-off Aug 2026 | 1200 Taylor St | unit 18: remodel bathroom and kitchen like for like, plumbing stays the same, rewire the apartment, paint and repair walls and ceiling as needed. update plumbing and electrical. nov# 200676850, 200670826, 200671107, 200560763.Details
unit 18: remodel bathroom and kitchen like for like, plumbing stays the same, rewire the apartment, paint and repair walls and ceiling as needed. update plumbing and electrical. nov# 200676850, 200670826, 200671107, 200560763. | $50,000 |
| Feb 10, 2026 | In progress issued Feb 2026 | 1943 Jackson St | in kind kitchen remodel and in kind 2 bathroom remodels like for like, upgrade plumbing and electrical. kitchen approx. 90 sq ft. each bathroom approx. 30 sq ft.Details
in kind kitchen remodel and in kind 2 bathroom remodels like for like, upgrade plumbing and electrical. kitchen approx. 90 sq ft. each bathroom approx. 30 sq ft. | $30,000 |
| Oct 6, 2025 | In progress issued Oct 2025 | 1470 15th St | 1 remodel 1 1/2 bathroom and 1 kitchen and install new floor new drywall 5/8 type x. remove old wall and install new electrical, new lights, new cabinets, and paint. new heater furnance in apt. all in-kind.Details
1 remodel 1 1/2 bathroom and 1 kitchen and install new floor new drywall 5/8 type x. remove old wall and install new electrical, new lights, new cabinets, and paint. new heater furnance in apt. all in-kind. | $38,000 |
| Sep 5, 2025 | Completed final sign-off Oct 2025 | 41 Jones St | proposed (n) comon kitchen addisiton with (e) common area at ground floor . no residential rooms will be removedDetails
proposed (n) comon kitchen addisiton with (e) common area at ground floor . no residential rooms will be removed | $50,000 |
| Sep 5, 2025 | Completed final sign-off Jan 2026 | 670 Eddy St | proposed new common kitchen addition within existing lobby/common area at main level floor to single room occupancy to (sro). not removing any residential guest room.Details
proposed new common kitchen addition within existing lobby/common area at main level floor to single room occupancy to (sro). not removing any residential guest room. | $35,000 |
| Aug 25, 2025 | Completed final sign-off Apr 2026 | 996 Noe St | lower unit: remodel one kitchen and two bathrooms, install (3) new windows in the back of the houseDetails
lower unit: remodel one kitchen and two bathrooms, install (3) new windows in the back of the house | $24,000 |
| May 16, 2025 | In progress issued May 2025 | 1906 Folsom St | to comply with nov 201076126 item #2 and nov 200725450 item #2 - remodel 6 kitchens and 6 bathrooms, repair back stairs and porch.Details
to comply with nov 201076126 item #2 and nov 200725450 item #2 - remodel 6 kitchens and 6 bathrooms, repair back stairs and porch. | $50,000 |
| Apr 15, 2025 | Completed final sign-off Mar 2026 | 996 Noe St | remodel kitchen & bathroom. remove galvanized pipe and install pex pipe and upgrade electricalDetails
remodel kitchen & bathroom. remove galvanized pipe and install pex pipe and upgrade electrical | $25,000 |
| Jan 6, 2025 | Expired or cancelled suspend Mar 2025 | 331 Shields St | interior remodel - remove old drywalls and install new drywall and kitchen cabinets.Details
interior remodel - remove old drywalls and install new drywall and kitchen cabinets. | $35,000 |
| Nov 26, 2024 | Completed final sign-off Feb 2025 | 405 Valencia St | proposed new kitchen within e 283 sq ft common room at main level and 185 sq ft storage room at basement levelDetails
proposed new kitchen within e 283 sq ft common room at main level and 185 sq ft storage room at basement level | $45,000 |
| Sep 12, 2024 | Completed final sign-off Jan 2025 | 528 Valencia St | proposed conversion of room 102 to a common kitchen within (e) building footprint at 2nd level floor.Details
proposed conversion of room 102 to a common kitchen within (e) building footprint at 2nd level floor. | $30,000 |
| Jan 24, 2024 | In progress filed Jan 2024, not yet issued | 115 Madrid St | create 1 new accessory dwelling unit at (e) basement with 1 living room, 2 bedrooms, toilet and 1 kitchen.Details
create 1 new accessory dwelling unit at (e) basement with 1 living room, 2 bedrooms, toilet and 1 kitchen. | $35,000 |
| Dec 22, 2023 | Completed final sign-off Mar 2024 | 846 Shotwell St | apt#5 remove & replace old kitchen cabinet doors and repair peeling walls and ceilings and paint thruout unit, install new tankless water heater at rear alley way. does not empede egress.Details
apt#5 remove & replace old kitchen cabinet doors and repair peeling walls and ceilings and paint thruout unit, install new tankless water heater at rear alley way. does not empede egress. | $25,000 |
| Aug 4, 2023 | Completed final sign-off Sep 2023 | 459 Turk St | remove/replace kitchen cabinets, paint new floor install new vanities medicine cabinets, stove, microwave, refrigerator at mgr's apartment. no residence guest rooms will be removed converted or demolishedDetails
remove/replace kitchen cabinets, paint new floor install new vanities medicine cabinets, stove, microwave, refrigerator at mgr's apartment. no residence guest rooms will be removed converted or demolished | $12,000 |
| Feb 17, 2023 | Never finaled issued Feb 2023, no final | 1472 15th St | remove old plaster walls and ceilings, install new kitchen cabinets, install new drywall and insulation, replace all doors and trim.Details
remove old plaster walls and ceilings, install new kitchen cabinets, install new drywall and insulation, replace all doors and trim. | $35,000 |
| Sep 20, 2022 | Completed final sign-off Nov 2022 | 2639 Mission St | minor t.i. to (e) g/f spaces. work to include 2 offices, community room & small kitchenette. (e) ada entries, ada bathrooms, hvac, f/s approved under pa202012261737.Details
minor t.i. to (e) g/f spaces. work to include 2 offices, community room & small kitchenette. (e) ada entries, ada bathrooms, hvac, f/s approved under pa202012261737. | $25,000 |
| Jul 26, 2022 | Completed final sign-off Mar 2023 | 3432 19th St | # 3432a: remove plaster walls and install new electrical wiring, insulation, and drywall throughout unit. no walls will be moved. install new kitchen cabinets. install new bathroom toilet, sink, and shower enclosure. wall work throughout unit. all work in-kind.Details
# 3432a: remove plaster walls and install new electrical wiring, insulation, and drywall throughout unit. no walls will be moved. install new kitchen cabinets. install new bathroom toilet, sink, and shower enclosure. wall work throughout unit. all work in-kind. | $45,000 |
| Jul 26, 2022 | Completed final sign-off Mar 2023 | 3432 19th St | # 3432: remove plaster walls and install new electrical wiring, insulation, and drywall throughout unit. no walls will be moved. install new kitchen cabinets. install new bathroom toilet, sink, and shower enclosure. wall work throughout unit. all work in-kind.Details
# 3432: remove plaster walls and install new electrical wiring, insulation, and drywall throughout unit. no walls will be moved. install new kitchen cabinets. install new bathroom toilet, sink, and shower enclosure. wall work throughout unit. all work in-kind. | $45,000 |
| Jun 3, 2022 | Completed final sign-off Nov 2022 | 548 Columbus Av | remodel bathroom & kitchen, repair all walls, replace electrical outlets, replace switches, replace light fixtures, replace flooring, repaint entire house interior.Details
remodel bathroom & kitchen, repair all walls, replace electrical outlets, replace switches, replace light fixtures, replace flooring, repaint entire house interior. | $35,000 |
| Apr 7, 2022 | Never finaled issued Apr 2022, no final | 835 Broadway | 2 bathrooms and 1 kitchen remodeling. remove old cabinets and install new. remove old toilet and sink and install new.Details
2 bathrooms and 1 kitchen remodeling. remove old cabinets and install new. remove old toilet and sink and install new. | $25,000 |
| Sep 17, 2021 | Completed final sign-off May 2022 | 5829 California St | kitchen and bathroom remodel. installation of spiral staircase to enlarge area by combining with storage area. replace wood beam in garage with steel beam. adding bathroom.Details
kitchen and bathroom remodel. installation of spiral staircase to enlarge area by combining with storage area. replace wood beam in garage with steel beam. adding bathroom. | $88,500 |
| Jun 18, 2021 | Completed final sign-off Jul 2022 | 347 Columbus Av | install new metal wall in kitchen & new floor tile, new light, new toilet,sink, new pint and new glass.Details
install new metal wall in kitchen & new floor tile, new light, new toilet,sink, new pint and new glass. | $25,000 |
| May 26, 2021 | Completed final sign-off Oct 2021 | 30 Corwin St | to comply with nov202176591: remodel bathroom in units 5/7/8/12. replace kitchen cabinets & countertops in units 5/12.replace countertops in units 7/8.Details
to comply with nov202176591: remodel bathroom in units 5/7/8/12. replace kitchen cabinets & countertops in units 5/12.replace countertops in units 7/8. | $15,000 |
| Mar 4, 2021 | Completed final sign-off Jul 2021 | 648 South Van Ness Av | remove old cabinets and isntall new. kitchen & bathyroom remodel. insall new lights and install new outlets and switches and new floor tile.Details
remove old cabinets and isntall new. kitchen & bathyroom remodel. insall new lights and install new outlets and switches and new floor tile. | $24,000 |
| Jul 18, 2019 | Never finaled issued Jul 2019, no final | 2127 Fillmore St | apt 11: remodel kitchen & 1 bathroom in-kind.Details
apt 11: remodel kitchen & 1 bathroom in-kind. | $8,000 |
| Feb 22, 2019 | Completed final sign-off Jul 2019 | 39 Jones St | alteration to (e) office space at lower level floor and (n) kitchenette remodell at mezzanine floor, also includes (n) lightitng & fixtures at (n) office #2, (n) replacement fixtures, cabinetry, at mezzanine levelDetails
alteration to (e) office space at lower level floor and (n) kitchenette remodell at mezzanine floor, also includes (n) lightitng & fixtures at (n) office #2, (n) replacement fixtures, cabinetry, at mezzanine level | $65,000 |
| Jan 11, 2019 | Completed final sign-off Mar 2019 | 2127 Fillmore St | apt #1 and apt #15 remodel two kitchens and two baths. remove old cabinets in kitchen and install new tile floor and one bathrom tile floor and tub wall and paint.Details
apt #1 and apt #15 remodel two kitchens and two baths. remove old cabinets in kitchen and install new tile floor and one bathrom tile floor and tub wall and paint. | $8,250 |
| Apr 18, 2018 | Never finaled issued Apr 2018, no final | 1690 Beach St | kitchen & (1) bath remodel in same location. no moving of doors/walls.Details
kitchen & (1) bath remodel in same location. no moving of doors/walls. | $12,000 |
| Mar 16, 2018 | Completed final sign-off Sep 2019 | 1419 Mason St | replacement of 8 windows at back of the house, same size. kitchen & bathroom remodel, same location. no moving of walls or door. n/a for maher.Details
replacement of 8 windows at back of the house, same size. kitchen & bathroom remodel, same location. no moving of walls or door. n/a for maher. | $75,000 |
| Dec 5, 2017 | Never finaled issued Dec 2017, no final | 1545 Grant Av | demo kitchen and bathroom, change outlets, switches, replace back window (not visible from street) new hardwiid flooringDetails
demo kitchen and bathroom, change outlets, switches, replace back window (not visible from street) new hardwiid flooring | $30,000 |
| Sep 18, 2017 | Completed final sign-off Sep 2019 | 1417 Mason St | remodel existing apartment units #1417 & #1421 mason with new kitchen & bathroom. no structural work. replacement of front bay windows shall match existing painted wood. install new floors, new heaterDetails
remodel existing apartment units #1417 & #1421 mason with new kitchen & bathroom. no structural work. replacement of front bay windows shall match existing painted wood. install new floors, new heater | $50,000 |