Pics Dba Molinar Construction
- Based in
- San Diego
- On San Francisco permits
- Dec 2014 to Jan 2016
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 63 days from filing to permit and 330 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2015 | Completed final sign-off May 2016 | 2000 Post St | refurbishment and repair to existing landscaping, replacement of freestanding bbqs with built in bbqs, removal and replacement of existing spa and repairs to existing pool decking. not visible from the streetDetails
refurbishment and repair to existing landscaping, replacement of freestanding bbqs with built in bbqs, removal and replacement of existing spa and repairs to existing pool decking. not visible from the street | $553,508 |