Picone Renovations
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Jun 2026
- Last 24 months
- 7 permits filed
76 permits since 2000: 55 completed, 2 in progress, 13 never finaled, 6 expired or cancelled.
Of the 13 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
6 deck permits: 3 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 78 days from filing to permit and 352 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Jun 2026 | 1 El Sereno Ct | remodel in kind kitchen and 2.5 x bathrooms. remove glass sunroom and replace damaged deck boards. upgrade electric as needed and install (n) subpanel. no wall removal or layout change. install leak detection system and earthquake gas shutoffDetails
remodel in kind kitchen and 2.5 x bathrooms. remove glass sunroom and replace damaged deck boards. upgrade electric as needed and install (n) subpanel. no wall removal or layout change. install leak detection system and earthquake gas shutoff | $193,000 |
| Jun 6, 2017 | Expired or cancelled expired Nov 2021 | 101 Upper Tr | enclose foyer, replace front door, renovate kitchen & 2 baths, infill lightwell, add lot line window, remove walls, move laundry. extend deck and add deck stair.Details
enclose foyer, replace front door, renovate kitchen & 2 baths, infill lightwell, add lot line window, remove walls, move laundry. extend deck and add deck stair. | $80,000 |
| Dec 17, 2015 | Completed final sign-off May 2017 | 3168 Clay St | replace deck in kind, add spiral stair @ rearDetails
replace deck in kind, add spiral stair @ rear | $12,000 |
| Oct 9, 2015 | Completed final sign-off Jun 2016 | 263 Upper Tr | revision to pa# 201405286905. change steel beams to lvl. build new ground level deck. deck not above 30" of grade. change position of rear stair.Details
revision to pa# 201405286905. change steel beams to lvl. build new ground level deck. deck not above 30" of grade. change position of rear stair. | $18,000 |
| Mar 6, 2013 | Completed final sign-off Apr 2014 | 523 32nd Av | rebuild deck as per plans. repair dryrot to enclosed landing as needed. tbd in field.Details
rebuild deck as per plans. repair dryrot to enclosed landing as needed. tbd in field. | $8,500 |
| Mar 26, 2010 | Never finaled issued Oct 2010, no final | 42 Upper Tr | rear deck addition and infill to existing rear bay window corners and partial lightwell; exterior work onlyDetails
rear deck addition and infill to existing rear bay window corners and partial lightwell; exterior work only | $80,000 |