Back to bathroom remodel contractors
Picone Renovations
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Jun 2026
- Last 24 months
- 7 permits filed
76 permits since 2000: 55 completed, 2 in progress, 13 never finaled, 6 expired or cancelled.
Of the 13 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 21 completed, 2 in progress, 3 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 139 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Jun 2026 | 1 El Sereno Ct | remodel in kind kitchen and 2.5 x bathrooms. remove glass sunroom and replace damaged deck boards. upgrade electric as needed and install (n) subpanel. no wall removal or layout change. install leak detection system and earthquake gas shutoffDetails
remodel in kind kitchen and 2.5 x bathrooms. remove glass sunroom and replace damaged deck boards. upgrade electric as needed and install (n) subpanel. no wall removal or layout change. install leak detection system and earthquake gas shutoff | $193,000 |
| Apr 16, 2026 | Completed final sign-off Sep 2026 | 4121 Cesar Chavez St | unit#1: remodel of master bathroom, all plumbing fixtures to remain in existing locationDetails
unit#1: remodel of master bathroom, all plumbing fixtures to remain in existing location | $21,000 |
| Feb 11, 2026 | In progress issued Feb 2026 | 124 Funston Av | remodel 1st floor bathroom in kind. no changes to layoutDetails
remodel 1st floor bathroom in kind. no changes to layout | $15,000 |
| Nov 13, 2025 | Completed final sign-off Apr 2026 | 519 Vermont St | remodel bathroom on 1st floor keeping (e) layout. install new electric sub-panel. "tub to shower" bath approx 60 sqftDetails
remodel bathroom on 1st floor keeping (e) layout. install new electric sub-panel. "tub to shower" bath approx 60 sqft | $40,000 |
| Feb 10, 2025 | Completed final sign-off Jun 2025 | 221 Warren Dr | revision to pa # 2025-0130-9346 extend ceiling height on non structural partition walls to 108" ubstak vekux light tunnel in each bathroom. light tunnel exceeds 5' from property lineDetails
revision to pa # 2025-0130-9346 extend ceiling height on non structural partition walls to 108" ubstak vekux light tunnel in each bathroom. light tunnel exceeds 5' from property line | $5,000 |
| Jan 30, 2025 | Completed final sign-off Jun 2025 | 221 Warren Dr | remodel 2 bathrooms in kind. location of fixtures does not change. replace electric subpanel.Details
remodel 2 bathrooms in kind. location of fixtures does not change. replace electric subpanel. | $70,000 |
| Jan 13, 2025 | Completed final sign-off Jan 2025 | 56 Jersey St | replacate non-load bearing partion wall and relocate (e) bathroom. change 2 kitchen windows and 1 bathroom non-streert visible at rear of house.Details
replacate non-load bearing partion wall and relocate (e) bathroom. change 2 kitchen windows and 1 bathroom non-streert visible at rear of house. | $7,500 |
| May 22, 2024 | Completed final sign-off Oct 2024 | 317 29th St | remodel bathroom non change to location of fixtures remove and install new kitchen counter tops, remodel in-kind.Details
remodel bathroom non change to location of fixtures remove and install new kitchen counter tops, remodel in-kind. | $27,500 |
| Feb 15, 2024 | Completed final sign-off Jan 2025 | 56 Jersey St | kitchen and 2 bathroom remodel. rewire entire house and install new subpanel.Details
kitchen and 2 bathroom remodel. rewire entire house and install new subpanel. | $125,000 |
| May 26, 2023 | Completed final sign-off Jan 2024 | 2197 Divisadero St | remodel 2 bathrooms on top floorDetails
remodel 2 bathrooms on top floor | $115,000 |
| May 26, 2023 | Completed final sign-off Nov 2024 | 364 Fair Oaks St | remodel master bathroom; location of sink, shower, tub and toilet do not change.Details
remodel master bathroom; location of sink, shower, tub and toilet do not change. | $65,000 |
| Mar 30, 2023 | Completed final sign-off Nov 2023 | 523 32nd Av | remodel kitchen & bathDetails
remodel kitchen & bath | $35,000 |
| Dec 15, 2021 | Completed final sign-off Apr 2022 | 66 Tiffany Av | remodel kitchen and 2 bathrooms. no wall layout changes. repair plaster at ceilings of living room and 2 bedrooms. total 100sf max of plaster repair.Details
remodel kitchen and 2 bathrooms. no wall layout changes. repair plaster at ceilings of living room and 2 bedrooms. total 100sf max of plaster repair. | $65,000 |
| Aug 6, 2021 | Completed final sign-off Oct 2021 | 88 Tiffany Av | kitchen: replace counter/ sink/ backsplash- upgrade electrical and plumbing as needed. bathroom: remodel in kind- replace all fixtures, plumbing and electric. no layout change, non structural. lights per cec 150.0 (k)Details
kitchen: replace counter/ sink/ backsplash- upgrade electrical and plumbing as needed. bathroom: remodel in kind- replace all fixtures, plumbing and electric. no layout change, non structural. lights per cec 150.0 (k) | $30,000 |
| Mar 29, 2021 | Completed final sign-off Aug 2021 | 218 26th Av | apt 302: remodel bathroom in-kind. replace all fixtures, new lighting and tile. layout remain unchanged. no walls modified/altered.Details
apt 302: remodel bathroom in-kind. replace all fixtures, new lighting and tile. layout remain unchanged. no walls modified/altered. | $35,000 |
| Jan 13, 2020 | Completed final sign-off Jul 2020 | 20 La Ferrera Tr | remodel master bathroom in same location on the 3/f.Details
remodel master bathroom in same location on the 3/f. | $30,000 |
| Nov 14, 2019 | Completed final sign-off Nov 2020 | 190 San Benito Wy | remodel 1/f guest bathroom, no changes to layoutDetails
remodel 1/f guest bathroom, no changes to layout | $35,000 |
| Apr 30, 2018 | Expired or cancelled expired Nov 2021 | 101 Upper Tr | renovate 3rd fl bath, replace window and door, demo walls, add roof deck and railsDetails
renovate 3rd fl bath, replace window and door, demo walls, add roof deck and rails | $20,000 |
| Nov 28, 2017 | Never finaled issued Nov 2017, no final | 34 Upper Tr | water damage repair - repair kitchen, bath, and 2 bedrooms ; remove & replace kitchen, new shower and bath tile and new flooring. maher n/aDetails
water damage repair - repair kitchen, bath, and 2 bedrooms ; remove & replace kitchen, new shower and bath tile and new flooring. maher n/a | $85,000 |
| Aug 16, 2017 | Expired or cancelled expired Nov 2021 | 101 Upper Tr | rev. to pa#201706068526, 1/f- new bathroom & replace washer/dryer. 2/f- ceiling to remain 8'4", revise framing @ ceiling & canopy, raise 2/f bathroom ceiling, repair dry rot at front wall.Details
rev. to pa#201706068526, 1/f- new bathroom & replace washer/dryer. 2/f- ceiling to remain 8'4", revise framing @ ceiling & canopy, raise 2/f bathroom ceiling, repair dry rot at front wall. | $10,000 |
| Jun 6, 2017 | Expired or cancelled expired Nov 2021 | 101 Upper Tr | enclose foyer, replace front door, renovate kitchen & 2 baths, infill lightwell, add lot line window, remove walls, move laundry. extend deck and add deck stair.Details
enclose foyer, replace front door, renovate kitchen & 2 baths, infill lightwell, add lot line window, remove walls, move laundry. extend deck and add deck stair. | $80,000 |
| May 14, 2014 | Never finaled issued May 2014, no final | 325 San Leandro Wy | remodel 2nd floor hall bathroom.Details
remodel 2nd floor hall bathroom. | $22,000 |
| Aug 6, 2013 | Completed final sign-off Oct 2013 | 120 Mallorca Wy | top floor (e) split bathroom - add sink to (e) toilet room and add toilet to (e) bathroom;Details
top floor (e) split bathroom - add sink to (e) toilet room and add toilet to (e) bathroom; | $14,000 |
| Mar 6, 2013 | Completed final sign-off Jun 2015 | 375 Country Club Dr | replace existing counter top, sink, faucet, cooktop and exhaust hood. possible wall oven replacement, replace cabinets in lower bath.Details
replace existing counter top, sink, faucet, cooktop and exhaust hood. possible wall oven replacement, replace cabinets in lower bath. | $3,500 |
| Aug 18, 2009 | Completed final sign-off Jan 2010 | 734 Ashbury St | unit #b -remodel closet into new bathroom located in existing master bedroom. replace exist 12" x 30" window w/new 30" x 18" window. no structural work.Details
unit #b -remodel closet into new bathroom located in existing master bedroom. replace exist 12" x 30" window w/new 30" x 18" window. no structural work. | $15,000 |
| May 9, 2008 | Completed final sign-off Jul 2008 | 520 Magellan Av | bathroom remodel, demo existing/moving non load bearing wall, tile floor & walls, install new tub, toilet, and sink.Details
bathroom remodel, demo existing/moving non load bearing wall, tile floor & walls, install new tub, toilet, and sink. | $26,000 |
| Jan 29, 2007 | Never finaled issued Jan 2007, no final | 520 Magellan Av | bath remodel-remove tub, toilet and tile. retile install new tub & toilet. new exhaust fan and 2 recessed lights. move position of rough-in for toilet. (for one bath room only). install motion switches for lighting.Details
bath remodel-remove tub, toilet and tile. retile install new tub & toilet. new exhaust fan and 2 recessed lights. move position of rough-in for toilet. (for one bath room only). install motion switches for lighting. | $19,000 |
| Aug 15, 2006 | Completed final sign-off Feb 2007 | 218 Shrader St | kitchen + bath remodel of 2 units. remove (e) cabinets + appliances demo walls to studs. no changes to (e) walls. replace cabinets + sheetrock. new plumbing ( water & drain). electecal to pull permit for electrical.Details
kitchen + bath remodel of 2 units. remove (e) cabinets + appliances demo walls to studs. no changes to (e) walls. replace cabinets + sheetrock. new plumbing ( water & drain). electecal to pull permit for electrical. | $140,000 |
| Aug 8, 2005 | Completed final sign-off Nov 2005 | 650 Delancey St | remodel kitchen and 2 baths no new walls windows replacing cabients tops and tile only plumbing andDetails
remodel kitchen and 2 baths no new walls windows replacing cabients tops and tile only plumbing and | $80,000 |