Phollies Russ Murphy Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2009 to Apr 2016
- Last 24 months
- 0 permits filed
36 permits since 2000: 32 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 40 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2013 | Completed final sign-off May 2013 | 4187 26th St | remove dry rot from (e) rear deck at 2nd floor staircase to remain as is. lower deck to remain as is. add new decking using ipe with hidden fasteners. replace 2" x 2" pickets. work to be less than 50% - not visible from street.Details
remove dry rot from (e) rear deck at 2nd floor staircase to remain as is. lower deck to remain as is. add new decking using ipe with hidden fasteners. replace 2" x 2" pickets. work to be less than 50% - not visible from street. | $8,000 |
| Jan 18, 2013 | Completed final sign-off Mar 2013 | 252 Grattan St | repair of 2 - 10'x10' decks + joining staircase as necessary due to dryrot. all new framing to be pressure treated. existing 1-hr fire wall to remain. existing lower deck (16'x20') to remain, new work is less than 50%.Details
repair of 2 - 10'x10' decks + joining staircase as necessary due to dryrot. all new framing to be pressure treated. existing 1-hr fire wall to remain. existing lower deck (16'x20') to remain, new work is less than 50%. | $20,000 |