Back to bathroom remodel contractors
Phollies Russ Murphy Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2009 to Apr 2016
- Last 24 months
- 0 permits filed
36 permits since 2000: 32 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 365 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2013 | Completed final sign-off Jan 2015 | 229 09th Av | foundation walls, add grade beams, moment frame and shear walls. insulate property line walls, convert existing second floor bath to laundry room; relocate existing ground floor bath.Details
foundation walls, add grade beams, moment frame and shear walls. insulate property line walls, convert existing second floor bath to laundry room; relocate existing ground floor bath. | $150,000 |
| Jul 10, 2013 | Never finaled issued Aug 2013, no final | 4187 26th St | new 5'-0" x 2'-10" rear horizontal bathroom extension for new bath tubDetails
new 5'-0" x 2'-10" rear horizontal bathroom extension for new bath tub | $3,000 |
| May 3, 2011 | Completed final sign-off Sep 2011 | 1438 Green St | remodel existing one bathroom- replace (ex) tub with shower encloser- replace 2 existing vanities with new, new tile, new toilet, lighting to comply with cec 150(k); no change to windows walls or doorsDetails
remodel existing one bathroom- replace (ex) tub with shower encloser- replace 2 existing vanities with new, new tile, new toilet, lighting to comply with cec 150(k); no change to windows walls or doors | $10,000 |
| Apr 27, 2011 | Completed final sign-off Apr 2012 | 132 Turquoise Wy | remodel 2 existing bathrooms on 2nd floor.Details
remodel 2 existing bathrooms on 2nd floor. | $15,000 |
| Jun 10, 2009 | Completed final sign-off Jun 2010 | 650 Clayton St | remodel bathrooms, new tub, sinks, toilets, shower stall. no structural changes . remodel in kind. provide high efficancy lights or "manual on" occupancy sensors.Details
remodel bathrooms, new tub, sinks, toilets, shower stall. no structural changes . remodel in kind. provide high efficancy lights or "manual on" occupancy sensors. | $24,000 |
| Mar 27, 2009 | Completed final sign-off Feb 2012 | 1376 Florida St | 3 story side & rear addition, convert to 2 units by adding 2 new bedrooms, 3 bathrooms, 2 kitchens, new garage at 1st floor, new curb cut & driveway. restore (e) front facade & front stairsDetails
3 story side & rear addition, convert to 2 units by adding 2 new bedrooms, 3 bathrooms, 2 kitchens, new garage at 1st floor, new curb cut & driveway. restore (e) front facade & front stairs | $250,000 |