Back to kitchen remodel contractors
Phoenix Construction
- Based in
- Novato
- On San Francisco permits
- Apr 2011 to Jun 2022
- Last 24 months
- 0 permits filed
20 permits since 2000: 14 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2017 | Never finaled issued Mar 2017, no final | 1300 Page St | remodel (e) kitchen in-kind in apt#1. no changes to structure. layout of kitchen to remain the same. no sheetrock removed.Details
remodel (e) kitchen in-kind in apt#1. no changes to structure. layout of kitchen to remain the same. no sheetrock removed. | $10,000 |