Peters Design - Build
- Based in
- San Francisco
- On San Francisco permits
- Apr 2016 to Feb 2017
- Last 24 months
- 0 permits filed
9 permits since 2000: 6 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 10 days from filing to permit and 288 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2016 | Completed final sign-off Sep 2017 | 1534 44th Av | replace flooring at 2nd floor, enclose covered 2nd floor lightwell, replace/reconfigure kitchen.Details
replace flooring at 2nd floor, enclose covered 2nd floor lightwell, replace/reconfigure kitchen. | $130,000 |
| Apr 28, 2016 | Completed final sign-off Mar 2017 | 1650 Florida St | cosmetic kitchen and relocation of bathroom. addition of closet space. replace furnace and water heater. replace 1 rear window - change in sizeDetails
cosmetic kitchen and relocation of bathroom. addition of closet space. replace furnace and water heater. replace 1 rear window - change in size | $30,000 |