Perrin Construction
- Based in
- So.Sf
- On San Francisco permits
- Feb 2015 to Jul 2017
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 6 days from filing to permit and 21 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2015 | Expired or cancelled expired Dec 2021 | 1455 41st Av | interior remodel of 2 story bldg to add habitable space into existing 1st fl to include bedrooms and bath. replace e garage door with new french doors with wood deck at bldg rearDetails
interior remodel of 2 story bldg to add habitable space into existing 1st fl to include bedrooms and bath. replace e garage door with new french doors with wood deck at bldg rear | $15,000 |
| Feb 17, 2015 | Completed final sign-off Mar 2015 | 771 Corbett Av | local deck repair - 50% or less - of three level deck. like to like repair/replacement of elements.Details
local deck repair - 50% or less - of three level deck. like to like repair/replacement of elements. | $19,500 |