Back to bathroom remodel contractors
Perrin Construction
- Based in
- So.Sf
- On San Francisco permits
- Feb 2015 to Jul 2017
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 13 days from filing to permit and 589 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 23, 2016 | Completed final sign-off Apr 2018 | 512 Elizabeth St | interior remodel of (e) 125 sq ft 1st floor mechanical room to convert 63 sq ft into habitable space for (n) bathing area for the master bath. no change to building envelopeDetails
interior remodel of (e) 125 sq ft 1st floor mechanical room to convert 63 sq ft into habitable space for (n) bathing area for the master bath. no change to building envelope | $18,200 |
| Oct 23, 2015 | Expired or cancelled expired Dec 2021 | 1455 41st Av | interior remodel of 2 story bldg to add habitable space into existing 1st fl to include bedrooms and bath. replace e garage door with new french doors with wood deck at bldg rearDetails
interior remodel of 2 story bldg to add habitable space into existing 1st fl to include bedrooms and bath. replace e garage door with new french doors with wood deck at bldg rear | $15,000 |