Perfect Homes Construction
- Based in
- San Jose
- On San Francisco permits
- Apr 2016 to Nov 2022
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 135 days from filing to permit and 468 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2022 | Completed final sign-off Dec 2023 | 1035 Ashbury St | 1)basement level: enlarge garage door opening. add utility sink and work area. 2)1st floor: remodel and reconfigure extg kitchen and bathroom. 3)2nd floor: reconfigure extg bedrooms & bathroom; add bathroom & stair to roof. 4)roof: create new roof deck with glass railing.Details
1)basement level: enlarge garage door opening. add utility sink and work area. 2)1st floor: remodel and reconfigure extg kitchen and bathroom. 3)2nd floor: reconfigure extg bedrooms & bathroom; add bathroom & stair to roof. 4)roof: create new roof deck with glass railing. | $158,280 |