Perez Rough Frame Specialists
- Based in
- San Pablo
- On San Francisco permits
- Oct 2025 to Sep 2026
- Last 24 months
- 6 permits filed
6 permits since 2000: 1 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 in progress. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 812 Lyon St | replace top boards at rear stairs. not visible from the street. redwood to trex.Details
replace top boards at rear stairs. not visible from the street. redwood to trex. | $30,000 |
| Mar 16, 2026 | In progress issued Mar 2026 | 1355 Francisco St | repair stringer for the stair just 8 ft and 4 x 4 post pt exterior, side of the house, not facing the street, in kind, not extend over the right of way, less than 50%Details
repair stringer for the stair just 8 ft and 4 x 4 post pt exterior, side of the house, not facing the street, in kind, not extend over the right of way, less than 50% | $4,000 |