Back to kitchen remodel contractors
Pegasus Builders
- Based in
- San Francisco
- On San Francisco permits
- Nov 2011 to Jan 2018
- Last 24 months
- 0 permits filed
26 permits since 2000: 22 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 219 days from filing to permit and 575 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2017 | Completed final sign-off Jan 2018 | 192 Yerba Buena Av | remodel (e) kitchen on main (2nd) floor. new doors at rear of building.Details
remodel (e) kitchen on main (2nd) floor. new doors at rear of building. | $30,000 |
| Sep 9, 2016 | Completed final sign-off Mar 2017 | 842 Shotwell St | kitchen and bathroom remodel as is. new sink, tub cabinets, reinstall sheetrock in unit.Details
kitchen and bathroom remodel as is. new sink, tub cabinets, reinstall sheetrock in unit. | $62,000 |
| Apr 8, 2015 | Completed final sign-off Feb 2018 | 3615 Market St | seismice strengthening; new roof membrane; rebuild of stair at interior; renovation of kitchen, bathroom, conversion of portion of garage/laundry to bedroom; conversion of bedroom to closet & powder room. replace 1 rear window - not visible from street no expansion of existing building envelope.Details
seismice strengthening; new roof membrane; rebuild of stair at interior; renovation of kitchen, bathroom, conversion of portion of garage/laundry to bedroom; conversion of bedroom to closet & powder room. replace 1 rear window - not visible from street no expansion of existing building envelope. | $97,500 |
| Dec 2, 2014 | Completed final sign-off Jun 2018 | 1401 Monterey Bl | rear addition of 39 sf @ 1st & 2nd fl w/ a additional 39 sf balcony off 2nd fl. garage addition is expande 95 sf @ side of home. garage door is moved to side of house & 1 2nd garage door is added. kitchen remodel w/ bathroom & stair.Details
rear addition of 39 sf @ 1st & 2nd fl w/ a additional 39 sf balcony off 2nd fl. garage addition is expande 95 sf @ side of home. garage door is moved to side of house & 1 2nd garage door is added. kitchen remodel w/ bathroom & stair. | $120,000 |
| Sep 25, 2013 | Never finaled issued Oct 2014, no final | 129 De Soto St | construct horizontal addition 8 renovate building interior construct (n) rear yard garage. add kitchen, bath & living to (e) first floor.Details
construct horizontal addition 8 renovate building interior construct (n) rear yard garage. add kitchen, bath & living to (e) first floor. | $375,000 |
| Nov 1, 2011 | Completed final sign-off Oct 2014 | 339 Kirkham St | remodel rear of house: remove 2bedrm, add (n) dining, kitchen & living rm & rear yard deck. relocate (e) bath & storage on level 2. remodel level 1 (garage), raise garage ceiling 2ft. add (n) family rm, bedrm & bath. add (n) level 3 in attic space in front, new fl in back w/ 3bedrm, 2bathrm. upgradeDetails
remodel rear of house: remove 2bedrm, add (n) dining, kitchen & living rm & rear yard deck. relocate (e) bath & storage on level 2. remodel level 1 (garage), raise garage ceiling 2ft. add (n) family rm, bedrm & bath. add (n) level 3 in attic space in front, new fl in back w/ 3bedrm, 2bathrm. upgrade | $150,000 |