Back to bathroom remodel contractors
Paz Construction Management Services
- Based in
- Danville
- On San Francisco permits
- Aug 2015 to Jul 2019
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 84 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2019 | Completed final sign-off Sep 2019 | 2686 Greenwich St | remodel 2 (e) bathrooms, in kind.Details
remodel 2 (e) bathrooms, in kind. | $15,000 |
| Jul 17, 2017 | Completed final sign-off Aug 2017 | 246 Clinton Pk | remodel (3) existing bathrooms, fixtures to say in same location. no structural work. smoke/carbon monoxide will be installed as per codeDetails
remodel (3) existing bathrooms, fixtures to say in same location. no structural work. smoke/carbon monoxide will be installed as per code | $37,000 |
| Apr 28, 2016 | Completed final sign-off Jan 2019 | 3253 Harrison St | foundation replacement & restructuring of garage framing to elminate center posts. addition of 2 bedroom, 1 bath @ 1st fl & stairs to 2nd. new roof deck & stairs to 3rd fl. minor interior remodeling, widen garage door & driveway, roof deck. infill under rear deckDetails
foundation replacement & restructuring of garage framing to elminate center posts. addition of 2 bedroom, 1 bath @ 1st fl & stairs to 2nd. new roof deck & stairs to 3rd fl. minor interior remodeling, widen garage door & driveway, roof deck. infill under rear deck | $165,000 |
| Aug 24, 2015 | Completed final sign-off Oct 2016 | 1694 York St | proposed interior remodel to reconfigure 1/f to accommodate one additional bedroom and 2 bathrooms. reconfigure 2/f area. lower 3/f to create additional ceiling height, remodel (e) bedrooms and bath. structural strengthening of the building. all work to be performed within (e) boundary of the bldg.Details
proposed interior remodel to reconfigure 1/f to accommodate one additional bedroom and 2 bathrooms. reconfigure 2/f area. lower 3/f to create additional ceiling height, remodel (e) bedrooms and bath. structural strengthening of the building. all work to be performed within (e) boundary of the bldg. | $315,000 |