Block 5526, lot 026
3253 Harrison St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 24, 2022 | Completed final sign-off Jan 2023 | 3253 Harrison St | Gadi Construction Inc | to comply with physical inpsection report #cc-8533Details
to comply with physical inpsection report #cc-8533 | $500 |
| Apr 26, 2022 | Completed final sign-off Nov 2022 | 3253 Harrison St | replace (9) street facing windows with wood or aluminum clad double hung windows.Details
replace (9) street facing windows with wood or aluminum clad double hung windows. | $2,000 | |
| Feb 14, 2022 | Completed final sign-off Apr 2022 | 3253 Harrison St | Gadi Construction Inc | no removal of wall -rev 202110059854. elec: grounding & bonding for main elec. gas piping ground electrode conductor. smoke alarm bri commmon areas. gfci kitchen/bathroom, backyard/ replaceable in-use cover. lower unit as well. remodel br/lr ref e202112067153. plumbing hose bibs/ vacuum breakers...Details
no removal of wall -rev 202110059854. elec: grounding & bonding for main elec. gas piping ground electrode conductor. smoke alarm bri commmon areas. gfci kitchen/bathroom, backyard/ replaceable in-use cover. lower unit as well. remodel br/lr ref e202112067153. plumbing hose bibs/ vacuum breakers... | $55,000 |
| Oct 5, 2021 | Completed final sign-off Apr 2022 | 3253 Harrison St | Gadi Construction Inc | all work in top unit. bathroom - upgrade electrical/mechanical. laundry room - relocate washer/dryer by 5' (electric) same roomDetails
all work in top unit. bathroom - upgrade electrical/mechanical. laundry room - relocate washer/dryer by 5' (electric) same room | $22,000 |
| Jun 12, 2020 | Completed final sign-off Sep 2020 | 3255 Harrison St | kitchen approx 6ftx12ft. replace 2 wooden cabinets, kitchen sink, countertops, backsplash, existing vented hood with like unit (no change to ventilation). replace tile floor with wood floor in breakfast room .Details
kitchen approx 6ftx12ft. replace 2 wooden cabinets, kitchen sink, countertops, backsplash, existing vented hood with like unit (no change to ventilation). replace tile floor with wood floor in breakfast room . | $8,000 | |
| Apr 28, 2016 | Completed final sign-off Jan 2019 | 3253 Harrison St | Paz Construction Management Services | foundation replacement & restructuring of garage framing to elminate center posts. addition of 2 bedroom, 1 bath @ 1st fl & stairs to 2nd. new roof deck & stairs to 3rd fl. minor interior remodeling, widen garage door & driveway, roof deck. infill under rear deckDetails
foundation replacement & restructuring of garage framing to elminate center posts. addition of 2 bedroom, 1 bath @ 1st fl & stairs to 2nd. new roof deck & stairs to 3rd fl. minor interior remodeling, widen garage door & driveway, roof deck. infill under rear deck | $165,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gadi Construction Inc (3), Paz Construction Management Services
- Architects
- Kelly D. Melendez
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.