Back to kitchen remodel contractors
Paul Wang
- Based in
- Milpitas
- On San Francisco permits
- Jul 2024 to May 2026
- Last 24 months
- 3 permits filed
5 permits since 2000: 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 in progress. Typically 34 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2025 | In progress issued Sep 2025 | 4157 23rd St | 1st floor convert (e) storage and inclose cover patio to living space. 2nd floor remodel (e) living space and convert protion of (e) garage to living space. 3rd floor remodel kitchen, reconfigure bathrooms. replace front windows with all wood clad. replace other windows with vinyl windows. add lightDetails
1st floor convert (e) storage and inclose cover patio to living space. 2nd floor remodel (e) living space and convert protion of (e) garage to living space. 3rd floor remodel kitchen, reconfigure bathrooms. replace front windows with all wood clad. replace other windows with vinyl windows. add light | $350,000 |
| Sep 20, 2024 | In progress issued Oct 2024 | 448 15th Av | revision to 202407176647 g/f: relocation stair, furnace, & water heater. no additional sf added. 2nd/f: kitchen & bathroom relocation & removation. 3rd/f: convert study into bedroom #4 & remodel, remodel bath #1 & bath #2Details
revision to 202407176647 g/f: relocation stair, furnace, & water heater. no additional sf added. 2nd/f: kitchen & bathroom relocation & removation. 3rd/f: convert study into bedroom #4 & remodel, remodel bath #1 & bath #2 | $250,000 |