Back to kitchen remodel contractors
Paul Totterdell Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to Sep 2023
- Last 24 months
- 0 permits filed
27 permits since 2000: 23 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2023 | Completed final sign-off Aug 2024 | 827 37th Av | kitchen and bathroom remodel. new vinyl windows at the rear. re-sheetrock at front. wood aluminum clad windows at the front (4) total. both units 11 windows total.Details
kitchen and bathroom remodel. new vinyl windows at the rear. re-sheetrock at front. wood aluminum clad windows at the front (4) total. both units 11 windows total. | $40,000 |
| Jun 4, 2020 | Completed final sign-off Nov 2020 | 1473 Francisco St | bathroom and kitchen remodel. replace cabinets and countertops in kind, electrical rewire, wall and ceiling insulation with new 5/8 sheet rock on ceilings refinish wood floors. new vinyl windows in rear of property replacing existing vinyl windows in kind.Details
bathroom and kitchen remodel. replace cabinets and countertops in kind, electrical rewire, wall and ceiling insulation with new 5/8 sheet rock on ceilings refinish wood floors. new vinyl windows in rear of property replacing existing vinyl windows in kind. | $80,000 |
| Nov 14, 2018 | Completed final sign-off May 2019 | 1467 Dolores St | partial kitchen remodel removing partial wall and banquette to replace with bar height counter top addition of (1) sink to half bath , remodeling current office space into master bathroom. remodeling (e) bedroom closetsDetails
partial kitchen remodel removing partial wall and banquette to replace with bar height counter top addition of (1) sink to half bath , remodeling current office space into master bathroom. remodeling (e) bedroom closets | $15,000 |
| Aug 31, 2017 | Completed final sign-off Jun 2018 | 103 Galewood Cr | kitchen remdoel - cabients, counter tile. two bathrooms & half bathroom remodel - cabinets, counters, tile, tub, shower).Details
kitchen remdoel - cabients, counter tile. two bathrooms & half bathroom remodel - cabinets, counters, tile, tub, shower). | $70,000 |
| Mar 18, 2016 | Completed final sign-off Jun 2016 | 1587 22nd Av | kitchen remodelDetails
kitchen remodel | $30,000 |
| May 12, 2014 | Completed final sign-off Dec 2014 | 3419 Geary Bl | convert (e) portion of living room to (n) bedroom. remodel (e) living room & bathroom & kitchen at unit 5 on 1st floor. new laundry room. replace (e) water heater & furnace.Details
convert (e) portion of living room to (n) bedroom. remodel (e) living room & bathroom & kitchen at unit 5 on 1st floor. new laundry room. replace (e) water heater & furnace. | $36,000 |
| Jan 3, 2013 | Completed final sign-off Jun 2013 | 155 Gardenside Dr | 1 kitchen & 1 bathroom remodel in same format, no wall relocation. replace 2 new ext. patio doors & 3 windows w/u-factor not to exceed 0.40. bronze aluminum frames same openings & double glazed units. lighting in kitchen & bathroom remodel shall comply w/cec 150(k)8 & 150(k)10.Details
1 kitchen & 1 bathroom remodel in same format, no wall relocation. replace 2 new ext. patio doors & 3 windows w/u-factor not to exceed 0.40. bronze aluminum frames same openings & double glazed units. lighting in kitchen & bathroom remodel shall comply w/cec 150(k)8 & 150(k)10. | $45,000 |