Back to kitchen remodel contractors
Patrick Jean-Philip Burger
- Based in
- Hayward
- On San Francisco permits
- Oct 2013 to Jun 2015
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 1 days from filing to permit and 532 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2015 | Completed final sign-off Dec 2016 | 109 Lake Merced Hill St South St | remodel existing apt 4a, removal of 9 lf non bearing wall at bdrm 2 closet and at kitchen. install 15 lf of new non bearing wall at hall clset, new closet at entry and new wall for relocated doorway to kitchen. relocate elec sub panel, new afci breakers as req. new appliances, sliding glass doors,Details
remodel existing apt 4a, removal of 9 lf non bearing wall at bdrm 2 closet and at kitchen. install 15 lf of new non bearing wall at hall clset, new closet at entry and new wall for relocated doorway to kitchen. relocate elec sub panel, new afci breakers as req. new appliances, sliding glass doors, | $82,000 |