Back to kitchen remodel contractors
Passaris Construction
- Based in
- Sonoma
- On San Francisco permits
- Mar 2001 to Oct 2015
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2015 | Completed final sign-off Mar 2016 | 2127 Broadway | widen opening in living room 12" each side. demo interior non load bearing partition in office. remove door, frame in. demo wall in kitchen, demo partion & door in den. build new wall at office, kitchen, bedroom #3 per plans. maher naDetails
widen opening in living room 12" each side. demo interior non load bearing partition in office. remove door, frame in. demo wall in kitchen, demo partion & door in den. build new wall at office, kitchen, bedroom #3 per plans. maher na | $31,500 |
| Jan 13, 2009 | Completed final sign-off Jun 2009 | 963 Page St | remodel kitchen, powder room. install 3 pairs of pocket doors (kitchen, master bedroom & master bathroom). add master bathoom all per plans.Details
remodel kitchen, powder room. install 3 pairs of pocket doors (kitchen, master bedroom & master bathroom). add master bathoom all per plans. | $155,000 |
| Feb 25, 2008 | Completed final sign-off Jul 2008 | 150 Lombard St | #104- relocate interior non-bearing walls. install new kitchen cabinets, countertops. paint interior. sheetrock and finish wall & soffit. add closet.Details
#104- relocate interior non-bearing walls. install new kitchen cabinets, countertops. paint interior. sheetrock and finish wall & soffit. add closet. | $91,250 |