Back to kitchen remodel contractors
Pascual Construction Inc Dba Sure Line P
- Based in
- Daly City
- On San Francisco permits
- Jan 2011 to Nov 2024
- Last 24 months
- 1 permit filed
24 permits since 2000: 23 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 9 completed, 1 never finaled. Typically 0 days from filing to permit and 101 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2023 | Completed final sign-off Mar 2024 | 690 Guerrero St | unit #6: bathroom renovation - replace tub, vanity, toilet, and electrical. kitchen renovation - replace cabinets, plumbing, electrical. electrical - rewire the whole unit, new 60 amp panel.Details
unit #6: bathroom renovation - replace tub, vanity, toilet, and electrical. kitchen renovation - replace cabinets, plumbing, electrical. electrical - rewire the whole unit, new 60 amp panel. | $30,000 |
| Sep 15, 2023 | Completed final sign-off Nov 2023 | 690 Guerrero St | unit#4: 1-bathroom-replace tub, vanity cbinet, faucet, lights,switches, fan; 1-kitchen-replace, cabinet, countertop, sink faucet, appliances; electrical-rewire entire unit, new subpanel 60 ampDetails
unit#4: 1-bathroom-replace tub, vanity cbinet, faucet, lights,switches, fan; 1-kitchen-replace, cabinet, countertop, sink faucet, appliances; electrical-rewire entire unit, new subpanel 60 amp | $30,000 |
| May 18, 2021 | Completed final sign-off May 2022 | 956 Ashbury St | 1 kitchen renovation: new cabinets, countertop, 12 outlets and 8 lights. relocate sink. 1 bathroom renovation: remove claw foot tub. install new shower pan, replace outlet, install 2 lights, upgrade electrical panel.Details
1 kitchen renovation: new cabinets, countertop, 12 outlets and 8 lights. relocate sink. 1 bathroom renovation: remove claw foot tub. install new shower pan, replace outlet, install 2 lights, upgrade electrical panel. | $23,000 |
| Feb 27, 2019 | Completed final sign-off May 2022 | 4340 Ulloa St | remodel kitchen & (e) stairs bath. new full bath upstairs. repair & replace dryrot. new down stair window at rear.Details
remodel kitchen & (e) stairs bath. new full bath upstairs. repair & replace dryrot. new down stair window at rear. | $45,000 |
| Dec 5, 2018 | Completed final sign-off May 2022 | 4340 Ulloa St | reconfigure upstairs hallway; remove kitchen wall and repair and replace dryrotDetails
reconfigure upstairs hallway; remove kitchen wall and repair and replace dryrot | $25,000 |
| Oct 23, 2018 | Completed final sign-off Feb 2019 | 350 Ney St | kitchen and bathroom renovation. no structural work. same layout.Details
kitchen and bathroom renovation. no structural work. same layout. | $25,000 |
| Apr 13, 2017 | Completed final sign-off May 2017 | 170 Clinton Pk | kitchen remodel - new cabinets & countertop. new window at rear. repatch ceiling & walls, paint. light, plum, new appliancesDetails
kitchen remodel - new cabinets & countertop. new window at rear. repatch ceiling & walls, paint. light, plum, new appliances | $6,295 |
| Jul 2, 2014 | Never finaled issued Sep 2014, no final | 1830 Clay St | work in unit #2. remodel bathroom, kitchen in existing apt. work include new pocket door, removal of sliding door, add new doors and add bathroom window per plan. upgrade electrical system. install new heating. maher n/a.Details
work in unit #2. remodel bathroom, kitchen in existing apt. work include new pocket door, removal of sliding door, add new doors and add bathroom window per plan. upgrade electrical system. install new heating. maher n/a. | $14,000 |
| Mar 12, 2014 | Completed final sign-off Jun 2014 | 267 San Jose Av | unit 1 - remodel kitchen and bathroom; to comply with cec150(k) 8 & 10. no new openings, no windows.Details
unit 1 - remodel kitchen and bathroom; to comply with cec150(k) 8 & 10. no new openings, no windows. | $18,000 |
| Aug 24, 2011 | Completed final sign-off Nov 2011 | 1177 California St | unit #1401: kitchen and bathroom renovationDetails
unit #1401: kitchen and bathroom renovation | $45,000 |