Pars Design & Construction
- Based in
- Walnut Creek
- On San Francisco permits
- Mar 2004 to Dec 2023
- Last 24 months
- 0 permits filed
23 permits since 2000: 10 completed, 1 in progress, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 5 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 26 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 31, 2020 | Completed final sign-off Feb 2021 | 3131 Fillmore St | repair less than 50% stairs located at courtyard due to water damage (dryrot)Details
repair less than 50% stairs located at courtyard due to water damage (dryrot) | $3,000 |
| Jun 26, 2017 | Completed final sign-off Apr 2018 | 3131 Fillmore St | renovation of (e) wine bar to include new bar counter top, bathroom renovation to accomodate handicap; replace existing connecting stairs to basementDetails
renovation of (e) wine bar to include new bar counter top, bathroom renovation to accomodate handicap; replace existing connecting stairs to basement | $80,000 |