Back to kitchen remodel contractors
Parkson Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Jun 2026
- Last 24 months
- 8 permits filed
37 permits since 2000: 21 completed, 3 in progress, 7 never finaled, 6 expired or cancelled.
Of the 7 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
7 kitchen remodel permits: 4 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 7 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2025 | Completed final sign-off Jan 2026 | 2971 25th Av | 1st floor: remodel bedroom and entertainment room. add kitchenette, powder room and 2 bedrooms.Details
1st floor: remodel bedroom and entertainment room. add kitchenette, powder room and 2 bedrooms. | $46,000 |
| Nov 25, 2024 | Completed final sign-off Jun 2025 | 2971 25th Av | 1)dinner room and kitchen ceiling and wall to reinstall gypsum wallboard, patch where required. ref permits 202407227007 and 202408198951; 2) replace one toilet fixture on second floorDetails
1)dinner room and kitchen ceiling and wall to reinstall gypsum wallboard, patch where required. ref permits 202407227007 and 202408198951; 2) replace one toilet fixture on second floor | $1,689 |
| Jan 5, 2024 | In progress issued Jan 2024 | 1039 Stockton St | repair approx. 100sf of floor tile in existing kitchen basement. maintain existing thresholds.Details
repair approx. 100sf of floor tile in existing kitchen basement. maintain existing thresholds. | $1,000 |
| Dec 5, 2023 | Completed final sign-off Aug 2024 | 119 Gennessee St | 2/f: remodel kitchen and bathroom. construction (n) bathroom, relocate bedroom to front, replace side and rear windows in-kind, not visible. max u-factor not greater than 0.30.Details
2/f: remodel kitchen and bathroom. construction (n) bathroom, relocate bedroom to front, replace side and rear windows in-kind, not visible. max u-factor not greater than 0.30. | $105,000 |
| Feb 25, 2022 | Never finaled issued Aug 2022, no final | 141 Blake St | kitchen remodel in-kind without plans. replace kitchen counters, cabinetry, and plumbing fixtures in unit address #141. no work to be performed in the unit addresses #139 and #143.Details
kitchen remodel in-kind without plans. replace kitchen counters, cabinetry, and plumbing fixtures in unit address #141. no work to be performed in the unit addresses #139 and #143. | $20,000 |
| Feb 4, 2022 | Expired or cancelled expired Jul 2025 | 2100 Alemany Bl | 1st fl remove illegal rear storage and interior partitions. remodel bath, habitable rooms, 2nd fl remodel bath, kitchen, rooms, add bath and add roof deck. fully comply nov 202177481.Details
1st fl remove illegal rear storage and interior partitions. remodel bath, habitable rooms, 2nd fl remodel bath, kitchen, rooms, add bath and add roof deck. fully comply nov 202177481. | $240,000 |
| Jun 13, 2020 | Completed final sign-off Dec 2020 | 493 04th Av | kitchen and bathroom remodel in-kind with no plans for unit #493 only. replace cabinets, all plumbing and electrical fixtures. no structural wall changesDetails
kitchen and bathroom remodel in-kind with no plans for unit #493 only. replace cabinets, all plumbing and electrical fixtures. no structural wall changes | $15,000 |