Back to kitchen remodel contractors
Paratore Construction
- Based in
- Millbrae
- On San Francisco permits
- Oct 2001 to Feb 2016
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 240 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2003 | Completed final sign-off Nov 2003 | 15 Mangels Av | remodel kitchen & bathrm. replace kit. cabinets as exntg new countertops,new tile over tub in bathrmDetails
remodel kitchen & bathrm. replace kit. cabinets as exntg new countertops,new tile over tub in bathrm | $10,000 |
| Oct 30, 2001 | Expired or cancelled expired Jan 2003 | 2005 Pine St | install kitchen cabinets 2 countertops tile bathrm floors above bathtub 2 shower repair plasterDetails
install kitchen cabinets 2 countertops tile bathrm floors above bathtub 2 shower repair plaster | $12,000 |