Paragon Management Construction
- Based in
- Daly City
- On San Francisco permits
- Jul 2018 to Mar 2026
- Last 24 months
- 5 permits filed
13 permits since 2000: 11 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 60 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2024 | Completed final sign-off Jun 2025 | 1964 Bush St | 3rd floor kitchen and bathroom remodel, replace windows at lightwell in kind. (no changes in size, not visible from street) and relace door at deck. removal of non structural wall at kitchen.Details
3rd floor kitchen and bathroom remodel, replace windows at lightwell in kind. (no changes in size, not visible from street) and relace door at deck. removal of non structural wall at kitchen. | $40,000 |