Back to bathroom remodel contractors
Paragon Management Construction
- Based in
- Daly City
- On San Francisco permits
- Jul 2018 to Mar 2026
- Last 24 months
- 5 permits filed
13 permits since 2000: 11 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2024 | Completed final sign-off Jun 2025 | 1964 Bush St | 3rd floor kitchen and bathroom remodel, replace windows at lightwell in kind. (no changes in size, not visible from street) and relace door at deck. removal of non structural wall at kitchen.Details
3rd floor kitchen and bathroom remodel, replace windows at lightwell in kind. (no changes in size, not visible from street) and relace door at deck. removal of non structural wall at kitchen. | $40,000 |
| Jun 2, 2022 | Completed final sign-off Sep 2022 | 1272 Rhode Island St | bathroom remodel with new shower pan fixture and recessed lights (x2) like for like: kitchen remodel with new cabinets and countertop. like for like. new recessed lights in livingroom and hallway x7.Details
bathroom remodel with new shower pan fixture and recessed lights (x2) like for like: kitchen remodel with new cabinets and countertop. like for like. new recessed lights in livingroom and hallway x7. | $35,000 |
| Jan 16, 2020 | Completed final sign-off Jul 2020 | 2295 Vallejo St | unit 403 - remodel 1 bathroom. remove bath tub & replace w/ shower pan. new plumning fixtures, vanity, toilet, new bath fan, new recessed lightsDetails
unit 403 - remodel 1 bathroom. remove bath tub & replace w/ shower pan. new plumning fixtures, vanity, toilet, new bath fan, new recessed lights | $12,000 |
| Dec 11, 2018 | Completed final sign-off Jan 2020 | 1230 Green St | revision to 201807235241. revise placement of bathroom at ground fl. revise direction of stair between ground fl and 2nd fl.Details
revision to 201807235241. revise placement of bathroom at ground fl. revise direction of stair between ground fl and 2nd fl. | |
| Jul 23, 2018 | Completed final sign-off Jan 2020 | 1230 Green St | ground floor media room in existing garage, stair to first floor, new bath at ground fl. new bike parking.Details
ground floor media room in existing garage, stair to first floor, new bath at ground fl. new bike parking. | $50,000 |